PROJECT INFORMATION:
The WWDC completed a Level I study in 1994 which identified a well site
and developed cost estimates which yield monthly rates acceptable to
district members. The water district requested that WWDC proceed to
Level II to construct a Madison test well and develop conceptual level
plans for storage and transmission components.
A Level II study was completed in 1995 wherein a good groundwater supply
was located. During the Level II process, the project service area was
reduced to include only the immediate Aladdin area. The project would
serve fourteen (14) taps. Conceptual level designs and cost estimates
were completed for the downsized system. The total Level III project
cost was estimated at $336,329, which includes the Level II well costs
($85,641), the transmission system ($230,778), and the distribution and
chlorination systems ($19,910). The distribution and chlorination systems
are not eligible for WWDC participation. Presently, the district is
investigating financing alternatives.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project remain on Level II-Hold status.