Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 82. PROJECT:Thayne Water Supply
LEVEL:I
SPONSOR:Town of Thayne
LOCATION:Lincoln County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 8 1995 I $50,000 1996

PROJECT INFORMATION:
The Town supplies water to 150 taps. The water supply system consists of a spring collection system which is pumped into a storage tank. The tank is located on a hillside approximately one mile from the corporate limits. The system cannot meet the present water demands including the fire flow requirements. There are plans to construct a new secondary school in town. Further, Thayne would like to expand through annexation but cannot provide the water for the proposed expansion. The system may need additional supply, transmission, and storage facilities.

Level I study served to inventory the existing system, evaluated water supply needs, and evaluated water supply alternatives for the Town of Thayne and the Bedford Water and Sewer District. Preliminary plans and cost estimates were developed for the preferred alternative. The proposed Level II study will include a water supply plan for the Town of Thayne, the Bedford Water and Sewer District and Turnerville (the Willow Creek Pipeline Company).

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be advanced to Level II status with an appropriation of $250,000.