Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
1997 LEGISLATIVE REPORT
Active Projects
40. | PROJECT: | Guernsey Water Supply | | | | | |
| LEVEL: | III |
| SPONSOR: | Town of Guernsey |
| LOCATION: | Platte County |
| PROGRAM: | New Development |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
8 |
1995 |
I |
$75,000 |
1996 |
|
|
Level III |
59 |
1996 |
II |
$550,000 |
1999 |
|
PROJECT INFORMATION:
In 1994, Guernsey and Hartville submitted applications requesting
assistance in evaluating water supply, treatment, storage, transmission
and distribution systems. Since the two municipalities are in proximity
and take water from the same source (shallow wells along the North
Platte River), the Commission conducted a joint Level I Master Plan
study to determine the feasibility of a regional approach to solving the
area's water supply problems. The study determined that a combined
system was not feasible. Two separate project reports were submitted,
with separate recommendations for each community. Guernsey's existing
supply source is a series of wells into the North Platte alluvium. This
project replaced one of the older and more vulnerable wells with a new
production well, and provided the necessary well head appurtenances,
controls and pipeline connections to incorporate the new well into the
existing system. In 1996 the Commission recommended that the project be
advanced in the New Development Program at Level III status with a budget
of $550,000. The financing plan included a 67% grant and a 33% loan at
an interest rate of 4% and a term of 20 years.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required on this project.
|