Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1997 LEGISLATIVE REPORT
Active Projects

 67. PROJECT:Pinedale Master Plan
LEVEL:III
SPONSOR:Town of Pinedale
LOCATION:Sublette
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 10 1994 I $125,000   1996
Level III 59 1996 I $3,550,000* 1999
*67% grant 33% loan (4%, 30 years)

PROJECT INFORMATION:
The Town of Pinedale is an incorporated municipality with a population of approximately 1200 residents. A Level II report was completed in 1993 for the Town of Pinedale. The town was under an EPA order to filter its water system and/or complete a watershed control plan. In 1994, the town's Watershed Control Plan was accepted by the EPA. The town obtains water directly from Fremont Lake and does not filter the raw water. The raw water intake is 70 feet deep. Chlorination is provided. The Level II report noted the Town of Pinedale needs a new water tank, appurtenant piping, and equipment to meet chlorine detention times.

In 1993, the town requested funding for a Level I water supply master plan to assess present/future needs and to evaluate the entire water system. The Level I study was completed in 1995 and refined the work outlined in the Level II study. The Level I study delineated the potential service boundaries and evaluated deficiencies in their supply and distribution system. The master plan provides a complete evaluation of their existing water supply and distribution system and identifies those areas outside the present service area that may be served by an expansion of the water system based on projected growth. The recently completed Level I report recommended that the Town of Pinedale construct a new pipeline from Fremont Lake to town and additional chlorination to meet chlorine detention time requirements, and provide redundant chlorination. The cost for those items is estimated to be $3,550,000. The project is currently under design and an early 1997 bid letting and contract award are anticipated. Construction is expected by the end of 1997.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required on this project.