Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1997 LEGISLATIVE REPORT
Active Projects

 81. PROJECT:Sidon Canal Rehabilitation
LEVEL:III
SPONSOR:Sidon Irrigation District
LOCATION:Big Horn County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III 206 1995 II $1,060,000* 1998
*50% grant, 50% loan (4%, 10 years)

PROJECT INFORMATION:
The Sidon Irrigation District serves about 50 irrigators and 12,000 acres of irrigated land. The sponsor originally applied for Level III funds to replace the Marchant Wash crossing. However, upon further examination, it became apparent that an inventory of the entire system would be more appropriate.

The 1993 Legislature approved Level II funding to assess the condition of the canal and appurtenant structures. The study was completed in 1994 and presented an inventory of the existing water supply system, identified needed improvements, and estimated costs of those improvements. A prioritized rehabilitation plan was developed. Conceptual designs and cost estimates were provided for six structures in critical need of improvement. Construction could begin in the fall of 1997.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required on this project.