Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Wyoming Water Development Program - Strategic Plan
December 31, 1997


V. Goals/Objectives/Strategies

The goals/objectives/strategies presented below are in numerical order of priority.

Goal I.

Water Resource Development - Develop unused and/or unappropriated water to meet the present and future needs of Wyoming and its citizens and improve existing water projects so they remain effective and viable assets for their users and Wyoming.

The WWDC is committed to meeting goals and outcomes by scheduling projects in a manner commensurate with available funds.

Objective I.A  Use the New Development Program to develop unused and/or unappropriated water by providing funding assistance to municipalities, irrigation districts, and special districts (project sponsors) to construct water supply facilities such as dams, diversion structures, groundwater wells and transmission pipelines.

Outcomes:

Completion of current projects as identified by the omnibus water bill and the specified reversion dates during the 99/00 biennium under the New Development Program. These projects will provide the following indirect benefits to the state:

  1. Preservation of Wyoming's water entitlements through effective and efficient use.

  2. Ensure that water is available for economic growth of the sponsor and the state.

  3. Improved state water infrastructure.

  4. Short-term economic benefits to the state in the form of jobs, increased material and equipment sales, and other indirect benefits to local and state economies.

Strategy I.A.1  Keep the public informed of the opportunities, limitations, and requirements of the New Development Program.

Output:

Thirty public meetings or hearings per biennium.

Biennial publication of the program criteria.

Annual publication of the legislative report.

Ten presentations to interest groups per biennium.

Strategy I.A.2   Receive applications for funding assistance on an annual basis for the following types of projects listed in priority: multipurpose, storage, new supply, new supply systems, hydropower, purchase of unused storage, and recreation. Evaluate project applications in accordance with the latest program criteria as developed by the Water Development Commission and Select Water Committee for the purpose of generating consistent and fair funding recommendations to the Governor and Legislature in a manner compatible with existing program financial resources.

Output:

Review all applications for funding and technical assistance within 60 days of receipt.

Strategy I.A.3  Complete Level I Reconnaissance studies on project applications, as appropriated and approved by the Legislature, to determine project opportunities to meet the applicants' existing and future water needs.

Output:

Review the final engineering report and make recommendations to the Wyoming Water Development Commission within 30 days of the application deadline as to whether to advance the project in the program. Those projects receiving a positive recommendation for funding by the Wyoming Water Development Commission will be included within the appropriate omnibus water bill for funding consideration by the Legislature.

Strategy I.A.4  Complete Level II Feasibility Studies for Level I projects deemed worthy of advancement and detailed project applications, as appropriated and approved by the Legislature, to determine project economic and technical feasibility.

Output:

Review the final engineering report and make recommendations to the WWDC within 30 days of the application deadline as to whether to advance the project in the program. Those projects receiving a positive recommendation for funding by the Wyoming Water Development Commission will be included within the appropriate omnibus water bill for funding consideration by the Legislature.

Strategy I.A.5  Provide funding assistance for Level III construction projects which develop unused and/or unappropriated water and are deemed good investments by the respective project sponsors, the Wyoming Water Development Commission, the Governor and the Legislature.

Output:

Investigate all Level III funding requests and make recommendations to the WWDC within 30 days of the application deadline. Upon approval by the WWDC, the funding request will be included in the Omnibus Water Bill - Construction for consideration by the Legislature.

Strategy I.A.6  Provide project management and oversight on Level III Construction Projects to assist the project sponsor through the construction process as well as insure effective and efficient use of the project appropriations.

Output:

Project agreements, promissory notes, mortgages and assignments and pledges of revenue will be completed by July 15th and submitted to project sponsors for finalization. Review of project plans, specifications and budgets will be completed within thirty (30) days from the date of submittal by the consultant. Progress payments will be processed within 30 days of submittal. WWDO staff will conduct a minimum of two monitoring tours during construction of the project.

Strategy I.A.7  Provide billings for and collections of outstanding loan payments.

Output:

Prepare and submit billings on an annual basis. Insure receipt of annual payments for all outstanding loans. There are fifty-six (56) active loan accounts.

Strategy I.A.8  Institute project inspections five years after project construction to determine the validity of the assumptions used in project planning and development and to verify project designs and construction methods. This information will assist the program in evaluating existing criteria and design practices.

Output:

Perform four such inspections each biennium and prepare formal reports on the findings.

Objective I.B  Continue to utilize the Rehabilitation Program to keep existing water supply projects effective and viable by providing funding assistance to municipalities, irrigation districts, and special districts (project sponsors) for the improvement of water supply projects completed and in use for at least 15 years.

Outcomes:

The scheduled completion of projects during the 99/00 biennium will be in accordance with the omnibus water bills. These projects will provide the following indirect benefits to the state:

  1. Preservation of Wyoming's water entitlements through effective and efficient use.

  2. Insurance that existing water supply projects remain effective and viable for the respective water users and the state.

  3. Improved state water infrastructure.

  4. Short-term economic benefits to the state in the form of jobs, increased material and equipment sales, and other indirect benefits to local and state economies.

Strategy I.B.1  Keep the public informed of the opportunities, limitations, and requirements of the Rehabilitation Program.

Output:

Twenty-five public meetings or hearings per biennium.

Biennial publication of the program criteria.

Annual publication of the legislative report.

Ten presentations to interest groups per biennium.

Strategy I.B.2  Receive applications for funding assistance on an annual basis for the following types of projects listed in priority: multipurpose, storage, water supply systems, hydropower, and recreation. Evaluate project applications in accordance with the latest program criteria as developed by the Water Development Commission and Select Water Committee for the purpose of generating consistent and fair funding recommendations to the Governor and Legislature in a manner compatible with existing program financial resources.

Output:

Review all applications for funding and technical assistance within thirty days of the application deadline.

Strategy I.B.3  Complete Level I Feasibility Studies on project applications, as appropriated and approved by the Legislature, to determine project economic and technical feasibility.

Output:

Perform a review of the final engineering reports and make recommendations to the WWDC within 30 days of the application deadline for financial assistance to determine whether to advance projects in the program. Those projects receiving a positive recommendation by the WWDC will be included with the omnibus water bill - planning, for consideration by the Legislature.

Strategy I.B.4  Provide funding assistance for Level III Construction Projects which rehabilitate existing water supply projects and are deemed good investments by the respective project sponsors, the Wyoming Water Development Commission, the Governor and the Legislature.

Output:

Perform a review of the final engineering reports and make recommendations to the WWDC within 30 days of the application deadline for financial assistance, to determine whether to advance the project in the program. Those projects receiving a positive recommendation by the WWDC will be included in the omnibus water bill for consideration by the Legislature.

Strategy I.B.5  Provide project management and oversight on Level III Construction Projects to assist the project sponsor through the construction process as well as insure effective and efficient use of the project appropriations.

Output:

Project agreements, promissory notes, mortgages and assignments and pledges of revenue will be completed by July 15th and submitted to project sponsors for finalization. Review of project plans, specifications and budgets will be completed within 30 days from the date of submittal by the consultant. Progress payments will be processed within 30 days of submittal. WWDO staff will conduct a minimum of two monitoring tours during construction of the project.

Strategy I.B.6  Provide billings for and collections of outstanding loan payments.

Output:

Prepare and submit billings on an annual basis. Insure receipt of annual payments for all outstanding loans. There are 50 loan accounts.

Goal II.

Water Resource Planning-Update and maintain the database pertaining to Wyoming's water resources through information developed from project specific studies, management of the state's water investments, completion of instream flow feasibility studies, performance of general water related research, and basin wide research and planning.

Objective II.A  Manage the state's existing water investments.

Outcomes:

  1. The state's investments in Buffalo Bill, Fontenelle, and Palisades Reservoir remain effective to serve existing and future water needs in the project areas. The state's water investments include 190,000 acre feet of storage space in Buffalo Bill Reservoir, 125,000 acre feet of water per year in Fontenelle Reservoir, and 33,000 acre feet of storage space in Palisades Reservoir.

  2. Increased revenues and assurances that project sponsors are not receiving "windfalls" from the state's investments in new development projects. The WWDC maintains a financial interest in 48 completed new development projects.

Strategy II.A.1  Insure that the state's repayment and operation/maintenance obligations are met on Buffalo Bill, Fontenelle and Palisades Reservoirs.

Output:

Include the state's repayment and operation/maintenance obligation in the biennial exception budget and make annual payments to the Bureau of Reclamation.

Strategy II.A.2  Insure that the state is receiving payments from its storage contractors.

Output:

Bill annually for the readiness to serve fees associated with the four existing storage contractors at Fontenelle Reservoir. Bill the Western Area Power Administration at Buffalo Bill Reservoir annually for the State's share of power revenues.

Strategy II.A.3  Monitor completed new development projects five years after project construction to determine the state's share of the revenues from water sales, if any.

Output:

Initiate four project monitoring programs each biennium and prepare formal reports on findings. Presently, the state is receiving revenues from the sale of the water from the Cheyenne Stage II Project and the Rawlins Groundwater Project. This type of income should increase in the future.

Objective II.B  Prepare instream flow feasibility studies

Outcomes:

Provide assistance to the State Engineer on whether to issue an instream flow water right.

Strategy II.B.1  Complete instream flow feasibility studies on the water right applications prepared by the Wyoming Game and Fish Department in a comprehensive and timely manner.

Output:

Completion of instream flow feasibility studies as requested.

Strategy II.B.2  Advise the State Engineer if granting the instream flow water right would impact other water rights or future water development opportunities in the area.

Output:

Testimony at instream flow hearings held by the State Engineer's Office and written comments on instream flow water right applications for each completed study in the biennium.

Objective II.C  Perform water related research that affects project development and addresses water issues that can impact the entire state.

Outcomes:

Fifteen water related research tasks, reports, or projects per biennium. Each of these tasks, reports or projects must promote:

  1. A technically sound and efficient staff.

  2. Reduced project costs.

  3. Improved understanding and reaction to federal requirements and issues.

Strategy II.C.1  Each project manager within the Water Development Office should monitor changing technology and construction techniques and define cost savings opportunities.

Output:

Each project manager should attend at least one seminar per biennium and advise the other managers of the information provided.

Strategy II.C.2  Monitor ever-changing federal policies related to permitting requirements for water projects.

Output:

Attend five meetings per biennium with federal officials to monitor project specific permitting requirements.

Strategy II.C.3  Remain current of existing and proposed federal legislation pertaining to the Endangered Species Act, Clean Water Act, and Safe Drinking Act.

Output:

Two reports to the Governor's Office per biennium on the impacts or benefits of proposed state or federal legislation on water development and management.

Objective II.D  Complete and maintain basin wide plans for each major drainage basin in Wyoming.

Outcomes:

An outline, a detailed cost estimate, and a schedule for a computerized strategic plan will be developed for the development and management of Wyoming's water resources.

Strategy II.D.1  Continue to cost share the Water Resources Data System with the Water Resources Center at the University of Wyoming to provide current water quantity and quality information to state agencies and the private sector.

Output:

Continuously updated computer compilations of water quality and quantity data throughout the state.

Strategy II.D.2  Develop a water planning process and complete studies for each major drainage basin within the state and prepare a state summary.

Output:

Plans for the following basins:
Green/Little Snake Rivers, Bear River, Snake River, Wind/Big Horn Rivers, Powder/Tongue Rivers, Northeast Wyoming, North Platte and Laramie Rivers.

State of Wyoming plan should be updated each biennium.