Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 13. PROJECT:Cheyenne Raw Water Supply
LEVEL:III
SPONSOR:City of Cheyenne
LOCATION:Laramie County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 8 1995 II $250,000   1996
Level III 45 1997 II $1,800,000* 2000
*50% grant, 50% loan (7 1/4%, 10 years)

PROJECT INFORMATION:
The Cheyenne Board of Public Utilities (CBPU) serves 61,890 people and 17,571 taps. In 1992, the CBPU requested funding for several projects. The WWDC suggested the CBPU complete a master plan to prioritize future improvements. The city's existing master plan had become dated and did not address the latest EPA requirements.

In 1993, the Wyoming Legislature approved funding to update the Cheyenne Water Supply Master Plan. In 1994 the master plan was completed and provides an inventory of the existing supply, treatment, and distribution systems. The plan identified needed improvements, suggested priorities, estimated costs, and serves as a planning tool for the city. Approximately $62,000,000 in needed capital improvements were identified. The identified improvements include an extensive upgrade to the CBPU Sherard Water Treatment Plant and several transmission system improvements. These improvements were prioritized and recommended for completion by the year 2007. Additional Level II analysis was recommended to refine designs and cost estimates.

In 1996, States West Water Resources Corporation completed a Level II study of the Cheyenne Water Supply System. Conceptual designs and cost estimates were prepared for 1) a raw water system to irrigate parks and golf courses, 2) piping and improvements to the raw water lines feeding the water treatment plant, 3) a new water transmission main to the east side of Cheyenne, 4) corrosion analysis, and 5) improvements to the Supervisory Control and Data Acquisition System. The Level II report recommended that the first priority of the CBPU should be construction of a raw water irrigation system. Under this concept an existing 16-inch main would be converted from treated water to raw water to irrigate 303 acres of land.

Many of the sprinkler systems in the Northwest quadrant parks are not presently metered and are relatively antiquated. Present water usage on the Northwest park complexes is uncertain, but lies somewhere between 2.4 mgd and 5 mgd for peak day demands. Due to the paucity of irrigation flow records, the Level II study utilized the maximum net irrigation provided by the Wyoming Irrigation Guide. The amounts of flow projected in the Level II study are therefore lower than actual.

The objective of the project is to convert as many parks and golf courses to raw water as is reasonably possible. With average daily flow in the order of 8 mgd and summer peaks in the 40 mgd range, it is obvious that measures to cut irrigation demands are warranted. Each 1 mgd in reduced treatment capacity saves $1.1 to $1.3 million in capital cost, plus reduced O&M costs. Direct capital cost savings would be in the range of $2.64 to $6.5 million for water treatment plant construction.

The Level II study shows that the alternative 30 year present worth of utilizing the existing 16-inch line for raw water delivery versus furnishing treated water for irrigation purposes saves between $5.216 and $6.329 million depending upon which financing alternative is available.

The project is currently under construction and it is anticipated it will be completed in 1998.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is recommended.