Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
1998 LEGISLATIVE REPORT
Project Reports
15. | PROJECT: | Chugwater Water Supply | | | | | |
| LEVEL: | II |
| SPONSOR: | Town of Chugwater |
| LOCATION: | Platte County |
| PROGRAM: | New Development (Levels I and II) |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
15 |
1996 |
I |
$75,000 |
1998 |
|
|
Level II |
46 |
1997 |
I |
$100,000 |
1998 |
|
PROJECT INFORMATION:
The 1990 census shows Chugwater has a population of 192. They
reportedly have 108 taps in town. Recently, a motel, restaurant,
Wyoming Transportation Department rest stop, and a convenience store
have been constructed near the I-25 interchange southwest of town.
The Town of Chugwater operates three wells less than 200' deep located
in the middle of town. The wells have been recently rehabilitated and
are apparently producing a water supply of good quality that exceeds the
current needs of the town. The well depths are 100 - 150 feet deep but
are surrounded by residential lots and are adjacent to the town's
maintenance shop, which are possible sources of contamination. The
town's water supply reservoir was constructed in 1939 and is
deteriorating. It is probably inadequate to store sufficient water to
meet present fire flow demands. In 1996, States West Water Resources
Corporation completed a Level I study. The study determined the
condition and capacity of the wells, transmission mains, and storage
tank and recommended:
- Protection of the well field and improvements to an existing well.
The town has proposed that the well field be fenced, improvements
made to the surface casing on one well and a well head protection
plan be implemented.
- Rehabilitation of the existing tank's roof and the associated
valving. The estimated life of the rehabilitated tank is 25
years. The report also recommended that the supply line to the
tank be replaced.
- Construction of a new tank sized to improve pressures in town and
to meet present fire flow requirements.
- Construction of a new well outside the existing well field. A new
well would improve water pressure in town and provide redundant
supply in the event that the other wells should become
contaminated.
Items 1 and 2 were advanced to Level III in 1997. Design and
Construction are underway. States West was hired in 1997 to complete a
Level II study to investigate the feasibility of constructing a new well
and a new tank for the Town of Chugwater. The study will be completed
in early 1998.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is needed at this time.
|