Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
1998 LEGISLATIVE REPORT
Project Reports
36. | PROJECT: | Gillette Rehabilitation | | | | | |
| LEVEL: | III |
| SPONSOR: | City of Gillette |
| LOCATION: | Campbell County |
| PROGRAM: | Rehabilitation |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level III |
45 |
1997 |
II |
$300,000* |
2000 |
|
| *50% grant |
PROJECT INFORMATION:
In a related project, two Madison Well Field wells have been drilled and
will be placed into operation in 1997. During the design of these two
wells it was determined that the existing electrical distribution system
for the Madison Well Field is inadequate. The condition will become
more critical once the two new wells are placed on line. The project
entails the installation of new electrical distribution cable, new
transformers, a grounding system, new surge arresters, new switch gear,
and new electrical controls. The installation of the needed equipment
will improve operational efficiency. It will also improve safety of
well field operations. It is anticipated that this project will be
completed by April, 1998.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.
|