Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 76. PROJECT:North Alpine Junction Water Supply
LEVEL:II-Hold
SPONSOR:Lincoln County Commissioners/Town of Alpine
LOCATION:Lincoln County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 8 1995 I $35,000   1996
Level II 15 1996 I Hold* 1998
*A block appropriation of $15,000 was made for all hold projects

PROJECT INFORMATION:
The project would serve 450 residents with 230 taps in the unincorporated area north of the Snake River. The current WWDC - Alpine Water Supply project is currently involved with approximately the same number of residents and taps in the incorporated area south of the river. The Lincoln County Commissioners, as well as the Town of Alpine, are concerned about the rapid development in the Alpine Junction area. They would like to develop a master plan for water (and sewer) service to serve the region including the residents of the areas north and south of the Snake River. This project is looking at both sides of the river as a possible future regional system. The Town of Alpine is also approaching this project as a regional system and had a crossover line placed in the plans of the new Snake River Bridge when it was constructed in the summer of 1995.

The applicants would like to drill a test well in the north area around the Port of Entry and also do some pump testing in that area. They would also like to complete additional population growth projections and reevaluate the land ownership in the Alpine area. Due to the rapid growth and changing of land ownership in the area, it will be hard to determine the service area and district boundaries for this project at the present time. Therefore, it is recommended to hold this project at Level II status at the present time until a district is formed. After a district is formed, the project will be eligible for Level II funding.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be retained at Level II-Hold status.