PROJECT INFORMATION:
The North Strawberry Canal supplies irrigation water to 3200 acres of
flood irrigation and sprinkler systems. The present diversion structure
is located at the mouth of Strawberry Canyon. The system requires water
to be pumped in order to serve some irrigated areas. The canal users
would like to replace the canal with a pipeline thereby converting the
system to a gravity pressure system to eliminate ditch losses and
pumping costs, and reduce maintenance costs.
The Level II study has prepared an inventory of the system, and
identifies needed improvements. The recommended facilities include
replacing canals with pipelines, new intake structure and controls,
headgate replacement, and related facilities. Total Level III project
cost is estimated at $1,052,000.
The sponsor is currently working toward formation of an irrigation
district.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.