PROJECT INFORMATION:
The community of Rafter J has a population of approximately 1,500
people. The community has a water supply system supplied by two wells
and a 200,000 gallon storage tank. The system serves 500 homes and 25
commercial taps. The system was originally designed to include three
wells and an additional tank. The Association is in the process of
forming a water and sewer district.
The plans and work conducted by the developer need to be updated and
verified. The 1997 Level II analysis will identify the problems and lay
out the ground work to complete the system.
This project had problems with its district formation and will require
an additional year, 1998, to complete Level II project.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.