Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 85. PROJECT:Riverton Master Plan
LEVEL:I
SPONSOR:City of Riverton
LOCATION:Fremont County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 46 1997 I $150,000 1998

PROJECT INFORMATION:
The sponsor utilizes 12 wells, a surface intake from the LeClair Canal, and a 4 MGD water treatment plant to meet the needs of its residents. The treatment plant is used to meet peak summer demands, and operates from May through September. During peak demand days this plant operates at 80% of its rated capacity.

The sponsor has indicated there are 1500-3000 people living on the periphery of Riverton, and at least 15 community water systems in and around the city. They have seen consistent growth in the city and expect this trend to continue. Further, they expect this growth to include an outward movement of their boundaries that may take in some or all of the outlying community water systems. These factors will require the sponsor's water system to expand.

The sponsor believes it will be the primary water supplier in this area, and requested the ongoing Level II study to assist them in planning for their future. Some of the items being examined are: planning area boundaries, facilities inventory, growth projections, projected water supply needs, development of alternatives to meet these needs, and cost estimates for these alternatives. The current Level II study will be completed in 1998.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.