Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1999 LEGISLATIVE REPORT
Active Projects

 82. PROJECT:Pine Bluffs Well Rehabilitation
LEVEL:III
SPONSOR:Town of Pine Bluffs
LOCATION:Laramie County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 10 1994 I $75,000   1996
Level II 8 1995 II $150,000   1996
Level III 59 1996 II $155,000* 1999
*50% grant, 50% loan (4%,20 years)

PROJECT INFORMATION:
The Town of Pine Bluff's water supply system consists of six wells, and a conveyance, storage, and distribution system. They are having difficulty with low pressure in some parts of their distribution system, and they are concerned with its age. The Town of Pine Bluffs has a population of 1054, and serves 510 taps. They are presently able to meet existing demands, however, anticipated growth may exceed present supplies.

In 1994, a Level I study was completed to inventory the existing water supply system, define needed improvements, and provide preliminary designs and cost estimates for those improvements. As a result of this study, the town requested advancement to Level II in order to perform well efficiency studies.

The Level II study was completed in 1995, and identifies several areas in need of repair or modification, including: replacement of well #5, its pumphouse, pump, telemetry, etc. ($75,141); rehabilitation of well #4, its pumphouse, pump, telemetry, etc. ($60,973); a transmission line from the wells directly to storage ($650,969); a chlorination system ($31,625); and distribution system improvements ($412,390). The latter two components are not eligible for WWDC funding. The eligible components of the project total $865,000.

The 1996 Legislature approved funding for the replacement of well #5 and rehabilitation of well #4. The town has hired an engineer who is preparing design documents. Construction is anticipated to begin and be completed in 1999.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.