Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2000 LEGISLATIVE REPORT
Active Projects

 37. PROJECT:Gillette Hidden Valley Storage and Transmission
LEVEL:III
SPONSOR:City of Gillette
LOCATION:Campbell County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 43 1992 I $200,000 1994
Level I 79 1993 I $50,000 1994
Level III 38 1998 I $2,040,000 2002
*50% grant

PROJECT DESCRIPTION:
Pursuant to goals set forth in the 1994 Gillette Master Water Plan, this project calls for construction of a 3 MG storage reservoir and appropriate transmission lines in the southwest portion of town. The existing system has recognized design shortfalls including a dead end line on Force Road and less than adequate fire flows. Installation of a new tank and lines would increase fire flows to over 1500 gpm in the Westridge and Hidden Valley areas and create a loop in the system, thereby improving water turnover and quality. The proposed transmission line that would link the proposed tank with a tank now under construction also completes a loop along the newly constructed Southern Drive. Significant growth has occurred in this portion of town such that these facilities would meet a current and future need. An evaluation of this project was prepared for the city by Stetson Engineering, Inc., which satisfactorily would serve as the WWDC Level II study.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the New Development Program at Level III with an appropriation of $1,350,000. The financing would include a 60% grant, $1,350,000, of the total project budget of $2,250,000. The remaining 40% will be funded from local sources.