Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2001 LEGISLATIVE REPORT
Completed Construction Projects
1. PROJECT: Airport Bench Water Supply
SPONSOR: Airport Bench W&S District
LOCATION: Big Horn County (Greybull)
PROGRAM: New Development
APPROPRIATION: $225,000
ACTUAL EXPENDITURES: $225,000
DESCRIPTION: Pipeline, storage tank
ENGINEER: Engineering Associates; Cody, Wyoming
CONTRACTOR: Whitlock Construction; Powell, Wyoming
2. PROJECT: Afton Water Supply
SPONSOR: Town of Afton
LOCATION: Lincoln County
PROGRAM: Rehabilitation
APPROPRIATION: $2,600,000
ACTUAL EXPENDITURES: $2,518,911
DESCRIPTION: Spring renovation, pipeline, storage tank, well
ENGINEER: Sunrise Engineering; Afton, Wyoming
CONTRACTOR: Kilroy Construction; Alpine, Wyoming
Snyder Construction; Lyman, Wyoming
AG SERVICES, Inc.; Blackfoot, Idaho
3. PROJECT: Alpine Water Supply
SPONSOR: Town of Alpine
LOCATION: Lincoln County
PROGRAM: New Development
APPROPRIATION: $700,000
ACTUAL EXPENDITURES: $700,000
DESCRIPTION: Pipeline, storage tanks, well
ENGINEER: Sunrise Engineering; Afton, Wyoming
CONTRACTOR: Kilroy Construction; Alpine, Wyoming
ABC Tank; Salt Lake City, Utah
4. PROJECT: American Road Water Supply Project
SPONSOR: American Road Water and Sewer District
LOCATION: Campbell County
PROGRAM: New Development
APPROPRIATION: $250,000
ACTUAL EXPENDITURES: $132,010
DESCRIPTION: New Well
ENGINEER: Wester-Wetstein Associates; Laramie, Wyoming
CONTRACTOR: Ruby Drilling; Gillette, Wyoming
5. PROJECT: Antelope Valley Storage Facility
SPONSOR: Antelope Valley Improvement & Service Dist.
LOCATION: Campbell County
PROGRAM: Rehabilitation
APPROPRIATION: $850,000
ACTUAL EXPENDITURES: $378,621
DESCRIPTION: Storage Tank
ENGINEER: Bruce Engineering Services; Gillette, Wyoming
CONTRACTOR: L&T Fabrication; Gillette, Wyoming
6. PROJECT: Basin Water Supply
SPONSOR: Town of Basin
LOCATION: Big Horn County
PROGRAM: New Development
APPROPRIATION: $1,750,000
ACTUAL EXPENDITURES: $1,152,204
DESCRIPTION: Pipeline, reservoirs
ENGINEER: Civil Engineering Professionals, Inc.;
Casper, Wyoming
CONTRACTOR: Larry's Inc.; Gillette, Wyoming
7. PROJECT: Bedford Water Supply
SPONSOR: Bedford Water and Sewer District
LOCATION: Lincoln County
PROGRAM: New Development
APPROPRIATION: $1,300,000
ACTUAL EXPENDITURES: $1,151,230
DESCRIPTION: Springs, well, pipeline
ENGINEER: Forsgren Associates, Inc.; Evanston, Wyoming
CONTRACTOR: Snyder Construction, Inc.; Evanston, Wyoming
8. PROJECT: Big Horn Basin Rural Water Supply
SPONSOR: Northwest Rural Water District
LOCATION: Park and Big Horn Counties
PROGRAM: New Development
APPROPRIATION: $11,410,000
ACTUAL EXPENDITURES: $11,410,000
DESCRIPTION: Rural domestic water supply for rural Park
and Big Horn Counties residents
ENGINEER: Engineering Associates; Cody, Wyoming
CONTRACTOR: Several
9. PROJECT: Big Horn Canal Improvements
SPONSOR: Big Horn Canal Irrigation District
LOCATION: Washakie and Big Horn Counties
PROGRAM: Rehabilitation
APPROPRIATION: $693,000
ACTUAL EXPENDITURES: $485,420
DESCRIPTION: Elk Creek Siphon
ENGINEER: Natural Resources Conservation Service
Donnell & Allred, Inc.; Worland, Wyoming
CONTRACTOR: Big Horn Redi-Mix; Greybull, Wyoming
10. PROJECT: Big Horn Spillway Improvement
SPONSOR: Big Horn Canal Irrigation District
LOCATION: Washakie County
PROGRAM: Rehabilitation
APPROPRIATION: $120,000
ACTUAL EXPENDITURES: $120,000
DESCRIPTION: Crooked S Wasteway
ENGINEER: Soil Conservation Service; Worland, Wyoming
CONTRACTOR: Big Horn Redi-Mix; Greybull, Wyoming
11. PROJECT: Big Piney Water Supply
SPONSOR: Town of Big Piney
LOCATION: Sublette County
PROGRAM: New Development
APPROPRIATION: $410,000
ACTUAL EXPENDITURES: $265,784
DESCRIPTION: Transmission pipeline
ENGINEER: Jorgensen Engineering; Jackson, Wyoming
CONTRACTOR: Eiden's Construction; Marbleton, Wyoming
12. PROJECT: Boulder Irrigation District
SPONSOR: Boulder Irrigation District Board
LOCATION: Sublette County
PROGRAM: Rehabilitation
APPROPRIATION: $42,815
ACTUAL EXPENDITURES: $52,815
DESCRIPTION: Repairs to diversion structure
ENGINEER: NA
CONTRACTOR: NA
13. PROJECT: Bridger Valley Pipeline
SPONSOR: Bridger Valley Joint Powers Board
LOCATION: Uinta County
PROGRAM: New Development
APPROPRIATION: $625,000
ACTUAL EXPENDITURES: $577,466
DESCRIPTION: Transmission line
ENGINEER: Uinta Engineering & Surveying; Evanston, Wyoming
CONTRACTOR: Snyder Construction; Lyman, Wyoming
14. PROJECT: Brooks Hat Six Water Supply
SPONSOR: Town of Evansville
LOCATION: Natrona County
PROGRAM: New Development
APPROPRIATION: $150,000
ACTUAL EXPENDITURES: $150,000
DESCRIPTION: Transmission pipeline
ENGINEER: Hibsman Associates; Casper, Wyoming
CONTRACTOR: Hedquist Construction; Casper, Wyoming
15. PROJECT: Buffalo Bill Dam and Reservoir
SPONSOR: State of Wyoming
LOCATION: Park County
PROGRAM: New Development
APPROPRIATION: $52,000,000
ACTUAL EXPENDITURES: $52,000,000
DESCRIPTION: Dam enlargement and power facilities
ENGINEER: Bureau of Reclamation; Cody, Wyoming
CONTRACTOR: ASI Moltz; Cody, Wyoming
16. PROJECT: Buffalo Hydropower
SPONSOR: Town of Buffalo
LOCATION: Johnson County
PROGRAM: New Development
APPROPRIATION: $1,075,000
ACTUAL EXPENDITURES: $1,045,033
DESCRIPTION: Installation of a hydropower unit
ENGINEER: States West Water Resources; Cheyenne, Wyoming
CONTRACTOR: Sulzer Canada; Ontario, Canada,
Larrys Inc.; Gillette, Wyoming,
ASI Moltz; Cody, Wyoming
17. PROJECT: Buffalo Municipal Reservoir
SPONSOR: Town of Buffalo
LOCATION: Johnson County
PROGRAM: New Development
APPROPRIATION: $13,600,000
ACTUAL EXPENDITURES: $13,232,084
DESCRIPTION: Construction of a municipal water supply reservoir
ENGINEER: States West Water Resources; Cheyenne, Wyoming
CONTRACTOR: ASI Moltz, Cody, Wyoming; Lamax Construction, Inc.
Basin,Wyoming; Bartlett Construction, Hanna, Wyoming
18. PROJECT: Buffalo Raw Water Supply
SPONSOR: City of Buffalo
LOCATION: Johnson County
PROGRAM: New Development
APPROPRIATION: $270,000
ACTUAL EXPENDITURES: $270,000
DESCRIPTION: Diversion facilities, pipeline
ENGINEER: R.G. Stuckert & Associates; Buffalo, Wyoming
CONTRACTOR: Venture Construction; Worland, Wyoming
19. PROJECT: Buffalo Water Supply
SPONSOR: City of Buffalo
LOCATION: Johnson County
PROGRAM: Rehabilitation
APPROPRIATION: $1,000,000
ACTUAL EXPENDITURES: $1,000,000
DESCRIPTION: Diversion dam, pipeline
ENGINEER: Grizzly Engineering, Inc.; Buffalo, Wyoming
CONTRACTOR: Fletcher Construction; Sheridan, Wyoming
20. PROJECT: Burlington Water Supply
SPONSOR: Town of Burlington
LOCATION: Big Horn County
PROGRAM: New Development
APPROPRIATION: $360,000
ACTUAL EXPENDITURES: $316,957
DESCRIPTION: Transmission Pipeline and Well Pumps
ENGINEER: MSE-HKM, Inc.; Sheridan, Wyoming
CONTRACTOR: Brandon Construction, Inc.; Powell, Wyoming
21. PROJECT: Carpenter Water Supply
SPONSOR: Carpenter Water and Sewer District
LOCATION: Laramie County
PROGRAM: New Development
APPROPRIATION: $360,000
ACTUAL EXPENDITURES: $328,620
DESCRIPTION: Wells, pumps, controls, disinfection, storage,
pipeline
ENGINEER: States West Water Resources Corporation;
Cheyenne, Wyoming
CONTRACTOR: Town & Country Plumbing, Inc.; Burns, Wyoming
22. PROJECT: Casper Alcova
SPONSOR: Casper Alcova Irrigation District
LOCATION: Natrona County
PROGRAM: Rehabilitation
APPROPRIATION: $1,263,000
ACTUAL EXPENDITURES: $1,231,925
DESCRIPTION: Canal lining
ENGINEER: Soil Conservation Service
CONTRACTOR: LaMax Construction; Basin, Wyoming
Big Horn Redi-Mix; Greybull, Wyoming
Central Contractors; Mills, Wyoming
Casper Concrete; Casper, Wyoming
Jerrys Irrigation; Powell, Wyoming
Hedquist Construction; Casper, Wyoming
71 Construction; Casper, Wyoming
23. PROJECT: Casper Raw Water Supply
SPONSOR: City of Casper
LOCATION: Natrona County
PROGRAM: Rehabilitation
APPROPRIATION: $1,600,000
ACTUAL EXPENDITURES: $1,117,314
DESCRIPTION: Diversion structure, dam rehabilitation, pipeline
ENGINEER: Civil Engineering Professionals, Inc.;
Casper, Wyoming
CONTRACTOR: Lamax Construction, Inc.; Basin, Wyoming
24. PROJECT: Centennial Water Supply
SPONSOR: Centennial Water and Sewer District
LOCATION: Albany County
PROGRAM: New Development
APPROPRIATION: $315,000
ACTUAL EXPENDITURES: $315,000
DESCRIPTION: Wells, pumps, pipeline, storage
ENGINEER: J.M Montgomery; Laramie, Wyoming
CONTRACTOR: Pete's Excavating; Torrington, Wyoming
25. PROJECT: Chamberlain Reservoir
SPONSOR: LaPrele Irrigation District
LOCATION: Converse County
PROGRAM: Rehabilitation
APPROPRIATION: $150,000
ACTUAL EXPENDITURES: $117,241
DESCRIPTION: Dam rehabilitation
ENGINEER: Western Water Consultants; Laramie, Wyoming
CONTRACTOR: Domino Construction; Laramie, Wyoming
26. PROJECT: Cheyenne King II Storage Facility
SPONSOR: City of Cheyenne
LOCATION: Laramie County
PROGRAM: New Development
APPROPRIATION: $1,534,000
ACTUAL EXPENDITURES: $1,510,000 (approx)
DESCRIPTION: 15 MG storage facility
ENGINEER: Black & Veatch; Denver, Colorado
CONTRACTOR: TIC; Casper, Wyoming
27. PROJECT: Cheyenne Raw Water Supply
SPONSOR: City of Cheyenne
LOCATION: Laramie County
PROGRAM: Rehabilitation
APPROPRIATION: $1,800,000
ACTUAL EXPENDITURES: $1,800,000
DESCRIPTION: Irrigation of park lands
ENGINEER: States West Water Resources Corporation;
Cheyenne, Wyoming
CONTRACTOR: Excel Construction; Sheridan, Wyoming
28. PROJECT: Cheyenne Stage I Rehabilitation
SPONSOR: City of Cheyenne
LOCATION: Carbon and Albany Counties
PROGRAM: Rehabilitation
APPROPRIATION: $13,700,000
ACTUAL EXPENDITURES: $13,307,212
DESCRIPTION: Slip lining existing collection pipe and
transmission line improvements
ENGINEER: CH2M Hill; Denver, Colorado
CONTRACTOR: Barcon Wyoming; Sheridan, Wyoming
29. PROJECT: Cheyenne Upper North Crow Reservoir
SPONSOR: City of Cheyenne
LOCATION: Laramie County
PROGRAM: Rehabilitation
APPROPRIATION: $3,500,000
ACTUAL EXPENDITURES: $3,070,448
DESCRIPTION: Dam rehabilitation
ENGINEER: States West Water Resources Corporation;
Cheyenne, Wyoming
CONTRACTOR: Larry's Inc.; Gillette, Wyoming
30. PROJECT: Cheyenne Water (Stage II)
SPONSOR: City of Cheyenne
LOCATION: Carbon County
PROGRAM: New Development
APPROPRIATION: $20,000,000
ACTUAL EXPENDITURES: $20,000,000
DESCRIPTION: Dams (2), collector pipeline
ENGINEER: Banner Associates, Inc.; Laramie, Wyoming
CONTRACTOR: Several
31. PROJECT: Cheyenne Well Rehabilitation
SPONSOR: City of Cheyenne
LOCATION: Laramie County
PROGRAM: Rehabilitation
APPROPRIATION: $1,450,000
ACTUAL EXPENDITURES: $1,450,000
DESCRIPTION: Replace 15 well in the municipal well field
ENGINEER: Bearlodge Ltd., Sundance, Wyoming
Wester-Wetstein & Associates; Laramie, Wyoming
Weston Engineering, Inc.; Laramie, Wyoming
CONTRACTOR: Sargent Irrigation; Scottsbluff, Nebraska
D.C. Drilling Co.; Lusk, Wyoming
Weston Engineering, Inc.; Upton, Wyoming
Magee Trucking; Cheyenne, Wyoming
Wards Well Service; Riverton, Wyoming
32. PROJECT: Chugwater Water Supply
SPONSOR: Town of Chugwater
LOCATION: Platte County
PROGRAM: Rehabilitation
APPROPRIATION: $103,500
ACTUAL EXPENDITURES: $101,818
DESCRIPTION: Pipeline
ENGINEER: States West Water Resources Corporation;
Cheyenne, Wyoming
CONTRACTOR: 71 Construction; Casper, Wyoming
33. PROJECT: Clearview Water Supply
SPONSOR: Clearview Improvement and Service District
LOCATION: Sweetwater County
PROGRAM: New Development
APPROPRIATION: $245,000
ACTUAL EXPENDITURES: $167,500
DESCRIPTION: Pipeline
ENGINEER: Johnson-Fermelia Company, Inc.; Rock Springs, Wyoming
CONTRACTOR: Lamax Construction; Basin, Wyoming
34. PROJECT: Cody Area Water Supply (Valley View)
SPONSOR: City of Cody
LOCATION: Park County
PROGRAM: New Development
APPROPRIATION: $785,000
ACTUAL EXPENDITURES: $785,000
DESCRIPTION: Potable water service to Valley View
ENGINEER: Engineering Associates; Cody, Wyoming
CONTRACTOR: Harris Trucking; Cody, Wyoming
35. PROJECT: Cody Raw Water
SPONSOR: City of Cody
LOCATION: Park County
PROGRAM: Rehabilitation
APPROPRIATION: $850,000
ACTUAL EXPENDITURES: $714,060
DESCRIPTION: Raw Water irrigation system rehabilitation
ENGINEER: Engineering Associates; Cody, Wyoming
CONTRACTOR: Brandon Construction, Inc.; Wyoming
36. PROJECT: Cokeville Tri-Diversion Dam
SPONSOR: Cokeville Watershed Improvement District
LOCATION: Lincoln County
PROGRAM: Rehabilitation
APPROPRIATION: $160,000
ACTUAL EXPENDITURES: $17,919
DESCRIPTION: Bank realignment, channel stabilization
and placement of bank rip rap
ENGINEER: Rio Verde Engineering; Pinedale, Wyoming
CONTRACTOR: Noble Construction; Cora, Wyoming
37. PROJECT: Cokeville Water Supply
SPONSOR: Town of Cokeville
LOCATION: Lincoln County
PROGRAM: New Development
APPROPRIATION: $629,000
ACTUAL EXPENDITURES: $629,000
DESCRIPTION: Wells, pumping station, transmission pipeline
and storage tank
ENGINEER: Forsgren Associates; Evanston, Wyoming
CONTRACTOR: JASCO, Inc.; Evanston, Wyoming
38. PROJECT: Collins Heights Water Supply
SPONSOR: Collins Heights Industrial Park I&S District
LOCATION: Campbell County
PROGRAM: New Development
APPROPRIATION: $200,000
ACTUAL EXPENDITURES: $141,182
DESCRIPTION: Transmission pipelines
ENGINEER: Centennial Engineering and Research; Gillette, Wyoming
CONTRACTOR: S & S Builders; Gillette, Wyoming
39. PROJECT: Cook Road Water Supply
SPONSOR: Cook Road Water District
LOCATION: Campbell County
PROGRAM: New Development
APPROPRIATION: $1,700,000
ACTUAL EXPENDITURES: $1,373,487
DESCRIPTION: New tank and transmission pipelines
ENGINEER: Stetson Engineering; Gillette, Wyoming
CONTRACTOR: Larry's Inc.; Gillette, Wyoming
40. PROJECT: Crystal-Granite Dam Rehabilitation
SPONSOR: City of Cheyenne
LOCATION: Laramie County
PROGRAM: Rehabilitation
APPROPRIATION: $4,100,000
ACTUAL EXPENDITURES: $4,041,703
DESCRIPTION: Dams (2)
ENGINEER: Harza Engineering Company; Denver, Colorado
CONTRACTOR: Gracon Construction Company; Loveland, Colorado
41. PROJECT: Deaver Canal Rehabilitation
SPONSOR: Town of Deaver and Deaver Irrigation District
LOCATION: Big Horn County
PROGRAM: Rehabilitation
APPROPRIATION: $120,000
ACTUAL EXPENDITURES: $51,786
DESCRIPTION: Canal conversion to pipeline
ENGINEER: Soil Conservation Service; Worland, Wyoming
CONTRACTOR: Deaver Irrigation District
42. PROJECT: Dixon Water Supply
SPONSOR: Town of Dixon
LOCATION: Carbon County
PROGRAM: Rehabilitation
APPROPRIATION: $215,000
ACTUAL EXPENDITURES: $215,000
DESCRIPTION: Infiltration gallery and transmission pipeline
ENGINEER: Lidstone and Anderson; Fort Collins, Colorado
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
43. PROJECT: Douglas Area Water Supply
SPONSOR: City of Douglas
LOCATION: Converse County
PROGRAM: New Development
APPROPRIATION: $1,700,000
ACTUAL EXPENDITURES: $1,676,442
DESCRIPTION: Well, pipeline, storage facility
ENGINEER: CEPI; Casper, Wyoming
CONTRACTOR: Hedquist Construction; Casper, Wyoming
44. PROJECT: Douglas Intake Structure
SPONSOR: City of Douglas
LOCATION: Converse County
PROGRAM: Rehabilitation
APPROPRIATION: $400,000
ACTUAL EXPENDITURES: $307,872
DESCRIPTION: Diversion and intake structure
ENGINEER: CEPI; Casper, Wyoming
CONTRACTOR: Russell Construction; Douglas, Wyoming
45. PROJECT: Dubois Water Supply
SPONSOR: Town of Dubois
LOCATION: Fremont County
PROGRAM: New Development
APPROPRIATION: $90,000
ACTUAL EXPENDITURES: $83,108
DESCRIPTION: Pump Station
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Wilkinson Construction; Dubois, Wyoming
46. PROJECT: Edgerton/Midwest Water Supply
SPONSOR: Salt Creek Joint Powers Board
LOCATION: Natrona County
PROGRAM: Rehabilitation
APPROPRIATION: $3,750,000
ACTUAL EXPENDITURES: $3,208,580
DESCRIPTION: Potable Water Transmission Pipeline
ENGINEER: Worthington, Lenhart and Carpenter, Inc.,
Casper, Wyoming
CONTRACTOR: Larrys, Inc.; Gillette, Wyoming
Bartlett, Inc.; Hanna, Wyoming
47. PROJECT: Elk Mountain Water Supply
SPONSOR: Town of Elk Mountain
LOCATION: Carbon County
PROGRAM: New Development
APPROPRIATION: $335,000
ACTUAL EXPENDITURES: $331,743
DESCRIPTION: Put Level II well on line
ENGINEER: PMPC; Saratoga, Wyoming
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
48. PROJECT: Encampment Water
SPONSOR: Town of Encampment
LOCATION: Carbon County
PROGRAM: New Development
APPROPRIATION: $200,000
ACTUAL EXPENDITURES: $181,602
DESCRIPTION: Diversion dam, pipeline
ENGINEER: Probity Engineering; Cheyenne, Wyoming
CONTRACTOR: Great Divide Construction; Baggs, Wyoming
49. PROJECT: Etna Diversion Dam
SPONSOR: Etna Irrigation District
LOCATION: Lincoln County
PROGRAM: Rehabilitation
APPROPRIATION: $200,000
ACTUAL EXPENDITURES: $152,765
DESCRIPTION: Diversion dam replacement
ENGINEER: Forsgren Associates; Evanston, Wyoming
CONTRACTOR: T.J.G., Inc.; Evanston, Wyoming
50. PROJECT: Evanston Raw Water Supply
SPONSOR: City of Evanston
LOCATION: Uinta County
PROGRAM: New Development
APPROPRIATION: $1,500,000
ACTUAL EXPENDITURES: $1,500,000
DESCRIPTION: Irrigation pipeline, pumps and primary filters
ENGINEER: Sunrise Engineering, Inc.; Afton, Wyoming
CONTRACTOR: Flare Construction; Coalville, Utah
51. PROJECT: Evansville Elkhorn Creek Water Supply
SPONSOR: Town of Evansville
LOCATION: Natrona County
PROGRAM: Rehabilitation
APPROPRIATION: $50,000
ACTUAL EXPENDITURES: $0
DESCRIPTION: Infiltration gallery and monitoring facility
ENGINEER: Hibsman Associates; Casper, Wyoming
CONTRACTOR: 71 Construction; Casper, Wyoming
52. PROJECT: Evansville Water Supply
SPONSOR: Town of Evansville
LOCATION: Natrona County
PROGRAM: New Development
APPROPRIATION: $750,000
ACTUAL EXPENDITURES: $382,606
DESCRIPTION: Water storage tank
ENGINEER: Hibsman Associates; Casper, Wyoming
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
53. PROJECT: Fairview Water Supply
SPONSOR: Fairview Water and Sewer District
LOCATION: Lincoln County
PROGRAM: New Development
APPROPRIATION: $502,000
ACTUAL EXPENDITURES: $391,640
DESCRIPTION: Well, storage and pipeline
ENGINEER: Forsgren Associates; Evanston, Wyoming
CONTRACTOR: JASCO; Evanston, Wyoming
54. PROJECT: Fairview Water Supply
SPONSOR: Fairview Irrigation District
LOCATION: Lincoln County
PROGRAM: Rehabilitation
APPROPRIATION: $150,000
ACTUAL EXPENDITURES: $150,000
DESCRIPTION: Open canal to pipeline design
ENGINEER: ARIX; Riverton, Wyoming
CONTRACTOR: NA
55. PROJECT: Ferris Diversion Dam Rehabilitation
SPONSOR: Ferris Irrigation District/Town of Torrington
LOCATION: Goshen County
PROGRAM: Rehabilitation
APPROPRIATION: $500,000
ACTUAL EXPENDITURES: $475,847
DESCRIPTION: Diversion dam, pipeline
ENGINEER: Western Water Consultants; Laramie, Wyoming
CONTRACTOR: Pete's Excavation; Torrington, Wyoming
56. PROJECT: Fontenelle Dam Repair
SPONSOR: State of Wyoming
LOCATION: Sweetwater County
PROGRAM: Rehabilitation
APPROPRIATION: $3,500,000
ACTUAL EXPENDITURES: $3,247,283
DESCRIPTION: Dam
ENGINEER: Bureau of Reclamation
57. PROJECT: Freedom Water Supply
SPONSOR: Freedom Water and Sewer District
LOCATION: Lincoln County
PROGRAM: New Development
APPROPRIATION: $737,000
ACTUAL EXPENDITURES: $678,899
DESCRIPTION: Well, storage, pipeline
ENGINEER: Forsgren; Evanston, Wyoming
CONTRACTOR: Snyder Construction; Lyman, Wyoming
58. PROJECT: Fremont Lake Reservoir
SPONSOR: Highland Irrigation District
LOCATION: Sublette County
PROGRAM: New Development
APPROPRIATION: $457,834
ACTUAL EXPENDITURES: $411,862
DESCRIPTION: Dam, headgates
ENGINEER: Soil Conservation Service
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
Noble Construction; Pinedale, Wyoming
59. PROJECT: Gillette Fort Union Well Field
SPONSOR: City of Gillette
LOCATION: Campbell County
PROGRAM: Rehabilitation
APPROPRIATION: $1,725,000
ACTUAL EXPENDITURES: $1,331,818
DESCRIPTION: Construction of ten new wells and a
supply pipeline
ENGINEER: Stetson Engineering; Gillette, Wyoming
Wester-Wetstein & Associates; Laramie, Wyoming
CONTRACTOR: Ruby Drilling; Gillette, Wyoming
DRM Construction; Gillette, Wyoming
Weston Engineering; Upton, Wyoming
60. PROJECT: Gillette Madison Well Field Expansion
SPONSOR: City of Gillette
LOCATION: Campbell County
PROGRAM: New Development
APPROPRIATION: $1,628,250
ACTUAL EXPENDITURES: $1,619,192
DESCRIPTION: Two New Wells, Improvement of another well, pipeline
ENGINEER: Wester-Wetstein; Gillette, Wyoming
CONTRACTOR: Jims Water Service; Gillette, Wyoming
Hot Iron; Gillette, Wyoming
Tower Construction; Gillette, Wyoming
61. PROJECT: Gillette Pipeline Project
SPONSOR: City of Gillette
LOCATION: City of Gillette
PROGRAM: New Development
APPROPRIATION: $408,700
ACTUAL EXPENDITURES: $301,684
DESCRIPTION: Pipeline
ENGINEER: Consolidated Engineers and Materials Testing;
Gillette, Wyoming
CONTRACTOR: S&S Builders; Gillette, Wyoming
62. PROJECT: Gillette Rehabilitation
LEVEL: III
PROGRAM: Rehabilitation
LOCATION: Campbell County
SPONSOR: City of Gillette
APPROPRIATION: $300,000,000
ACTUAL EXPENDITURES: $300,000,000
DESCRIPTION: Installation of new electrical distribution
cable, new transformers, grounding system, new
surge arresters, new switch gear, and new electrical
controls.
ENGINEER: Cooper Power Systems; Pittsburgh, Pennsylvania
Consolidated Engineering & Material Testing;
Gillette, Wyoming
CONTRACTOR: Automation & Electronics; Casper, Wyoming
(Numerous suppliers)
63. PROJECT: Glenrock Water Supply
SPONSOR: Town of Glenrock
LOCATION: Converse County
PROGRAM: New Development
APPROPRIATION: $2,500,000
ACTUAL EXPENDITURES: $1,941,720
DESCRIPTION: Wells, pipeline
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Larry's Inc.; Gillette, Wyoming
64. PROJECT: Goshen Canal Improvements
SPONSOR: Goshen Irrigation District
LOCATION: Goshen County
PROGRAM: Rehabilitation
APPROPRIATION: $24,500
ACTUAL EXPENDITURES: $24,303
DESCRIPTION: Automate three canal spillway gates
ENGINEER: Lidstone & Anderson; Fort Collins, Colorado
CONTRACTOR: Sutron Corporation; Sterling, Virginia
65. PROJECT: Goshen Irrigation District Rehabilitation
SPONSOR: Goshen Irrigation District
LOCATION: Goshen County
PROGRAM: Rehabilitation
APPROPRIATION: $600,000
ACTUAL EXPENDITURES: $437,688
DESCRIPTION: Canal conversion to pipeline
ENGINEER: Kennedy Engineering; Wheatland, Wyoming
CONTRACTOR: Goshen Irrigation District
66. PROJECT: Goshen Pump Station
SPONSOR: Goshen Irrigation District
LOCATION: Goshen County
PROGRAM: Rehabilitation
APPROPRIATION: $330,000
ACTUAL EXPENDITURES: $330,000
DESCRIPTION: Pump station
ENGINEER: AVI; Cheyenne, Wyoming
Lidstone-Anderson; Ft. Collins, Colorado
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
Johns Pump Service; Torrington, Wyoming
67. PROJECT: Greybull Rehabilitation
SPONSOR: Town of Greybull
LOCATION: Big Horn County
PROGRAM: Rehabilitation
APPROPRIATION: $355,000
ACTUAL EXPENDITURES: $322,764
DESCRIPTION: Water system rehabilitation
ENGINEER: Crank Companies, Inc.; Kemmerer, Wyoming
CONTRACTORS: Lamax Construction; Basin, Wyoming
Automation Electronics; Casper, Wyoming
68. PROJECT: Grover Water Supply
SPONSOR: Grover Water and Sewer District
LOCATION: Lincoln County
PROGRAM: New Development
APPROPRIATION: $493,000
ACTUAL EXPENDITURES: $493,000
DESCRIPTION: Well storage, pipeline
ENGINEER: Forsgren Associates; Evanston, Wyoming
CONTRACTOR: JASCO; Evanston, Wyoming
69. PROJECT: Guernsey Water Supply
SPONSOR: Town of Guernsey
LOCATION: Goshen County
PROGRAM: New Development
APPROPRIATION: $550,000
ACTUAL EXPENDITURES: $511,995
DESCRIPTION: Construction of a new well and a supply pipeline
ENGINEER: TST Engineering; Denver, Colorado
Weston Engineering, Laramie Wyoming
CONTRACTOR: D. C. Drilling; Wheatland, WY
High Plains Construction; Casper, Wyoming
70. PROJECT: Gunbarrel Lateral Rehabilitation
SPONSOR: Platte County Resource District
LOCATION: Platte County
PROGRAM: Rehabilitation
APPROPRIATION: $250,000
ACTUAL EXPENDITURES: $210,782
DESCRIPTION: Replaced an open ditch with a buried pipeline.
Provided construction materials only.
ENGINEER: Natural Resources Conservation Service
CONTRACTOR: Sponsor
71. PROJECT: Hanover Irrigation
SPONSOR: Hanover Irrigation District
LOCATION: Washakie County
PROGRAM: Rehabilitation
APPROPRIATION: $600,000
ACTUAL EXPENDITURES: $600,000
DESCRIPTION: Moss catcher and structure
ENGINEER: Crank Companies, Inc.; Kemmerer, Wyoming
CONTRACTOR: R-D Construction; Casper, Wyoming
Magic Valley Heliac; Twin Falls, Idaho
72. PROJECT: Hawk Springs
SPONSOR: Horse Creek Conservation District
LOCATION: Goshen County
PROGRAM: Rehabilitation
APPROPRIATION: $8,871,000
ACTUAL EXPENDITURES: $8,491,098
DESCRIPTION: Dams, canals
ENGINEER: Soil Conservation Service; Casper, Wyoming
CONTRACTOR: Several
73. PROJECT: Highland Hanover Rehabilitation
SPONSOR: Highland Hanover Irrigation District
LOCATION: Washakie County
PROGRAM: Rehabilitation
APPROPRIATION: $536,000
ACTUAL EXPENDITURES: $536,000
DESCRIPTION: Pump station rehab; canal and lateral repairs
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Mainline Construction; Billings, Montana
Big Horn Red-Mix; Worland, Wyoming
Tesco Electric; Worland, Wyoming
74. PROJECT: Highline Ditch Rehabilitation
SPONSOR: Highline Irrigation District
LOCATION: Sheridan County
PROGRAM: Rehabilitation
APPROPRIATION: $260,000
ACTUAL EXPENDITURES: $231,560
DESCRIPTION: Diversion dam, pipeline
ENGINEER: Engineering, Inc.; Sheridan, Wyoming
CONTRACTOR: Fletcher Construction; Sheridan, Wyoming
75. PROJECT: Hulett Water Supply
SPONSOR: Town of Hulett
LOCATION: Crook County
PROGRAM: New Development
APPROPRIATION: $250,000
ACTUAL EXPENDITURES: $246,635
DESCRIPTION: Pump, storage tank and pipeline
ENGINEER: Weston Engineering; Upton, Wyoming
CONTRACTOR: S & S Builders; Gillette, Wyoming
76. PROJECT: Hunt Canal Rehabilitation
SPONSOR: Hunt Irrigation District
LOCATION: Big Horn County
PROGRAM: Rehabilitation
APPROPRIATION: $650,000
ACTUAL EXPENDITURES: $640,000
DESCRIPTION: Diversion dam and headgate replacement, canal repairs
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Nichols and Lewis; Lovell, Wyoming
77. PROJECT: Indian Springs Water Supply
SPONSOR: Indian Springs Improvement and Service District
LOCATION: Natrona County
PROGRAM: New Development
APPROPRIATION: $150,000
ACTUAL EXPENDITURES: $107,713
DESCRIPTION: Transmission pipeline
ENGINEER: Hibsman Associates; Casper, Wyoming
CONTRACTOR: High Plains Construction; Mills, Wyoming
78. PROJECT: Iron Creek Rehabilitation
SPONSOR: Shoshone/Deaver Irrigation Districts
LOCATION: Park County
PROGRAM: Rehabilitation
APPROPRIATION: $1,500,000
ACTUAL EXPENDITURES: $1,500,000
DESCRIPTION: Tunnel repair
ENGINEER: Harza Engineering Company; Denver, Colorado
CONTRACTOR: Shoshone Irrigation District
79. PROJECT: Jackson Raw Water Supply
SPONSOR: Town of Jackson
LOCATION: Teton County
PROGRAM: New Development
APPROPRIATION: $450,000
ACTUAL EXPENDITURES: $450,000
DESCRIPTION: Irrigation and thaw wells, pipeline, and pumps
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Thomas Drilling; Afton, Wyoming
G.M. Stewart Corporation; Evanston, Wyoming
80. PROJECT: Jackson Water Supply
SPONSOR: Town of Jackson
LOCATION: Teton County
PROGRAM: New Development
APPROPRIATION: $2,300,000
ACTUAL EXPENDITURES: $1,952,515
DESCRIPTION: Three new wells with control building
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: H-K Contractors, Inc.; Idaho Falls, ID
81. PROJECT: Kemmerer City Dam Rehabilitation
SPONSOR: City of Kemmerer
LOCATION: Lincoln County
PROGRAM: Rehabilitation
APPROPRIATION: $940,000
ACTUAL EXPENDITURES: $940,000
DESCRIPTION: Dam repair
ENGINEER: Woodward-Clyde Consultants; Denver, Colorado
CONTRACTOR: Nicholas Construction Company; Denver, Colorado
82. PROJECT: Kirby Ditch
SPONSOR: Kirby Ditch Irrigation District
LOCATION: Hot Springs County
PROGRAM: Rehabilitation
APPROPRIATION: $60,000
ACTUAL EXPENDITURES: $42,069
DESCRIPTION: Siphon and Wasteway
ENGINEER: Natural Resources Conservation Service, Wyoming
CONTRACTOR: W.A.R., Inc.; Thermopolis, Wyoming
83. PROJECT: Kirby Ditch
SPONSOR: Kirby Irrigation District
LOCATION: Hot Springs County
PROGRAM: Rehabilitation
APPROPRIATION: $141,000
ACTUAL EXPENDITURES: $70,363
DESCRIPTION: Siphon, measuring devices
ENGINEER: Soil Conservation Service; Worland, Wyoming
CONTRACTOR: Big Horn Red Mix; Greybull, Wyoming
84. PROJECT: Lake Adelaide Reservoir Enlargement
SPONSOR: Shell Valley Watershed Improvement District
LOCATION: Big Horn County
PROGRAM: New Development
APPROPRIATION: $2,200,000
ACTUAL EXPENDITURES: $1,840,503
DESCRIPTION: Dam enlargement
ENGINEER: ESA Consultants, Inc.; Fort Collins, Colorado
CONTRACTOR: MRC, Inc.; Casper, Wyoming
85. PROJECT: Lake Hattie Dam Rehabilitation
SPONSOR: Pioneer Canal - Lake Hattie Irrigation District
LOCATION: Albany County
PROGRAM: Rehabilitation
APPROPRIATION: $360,000
ACTUAL EXPENDITURES: $345,580
DESCRIPTION: Dam repair
ENGINEER: Western Water Consultants; Laramie, Wyoming
CONTRACTOR: Domino Construction; Laramie, Wyoming
86. PROJECT: Lake Hattie Supply Canal
SPONSOR: Lake Hattie Irrigation District
LOCATION: Albany County
PROGRAM: Rehabilitation
APPROPRIATION: $1,400,000
ACTUAL EXPENDITURES: $1,270,195
DESCRIPTION: Canal structures and alignment
ENGINEER: Western Water Consultants; Laramie, Wyoming
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
Domson, Inc.; Torrington, Wyoming
87. PROJECT: Lance Creek Water Rehabilitation
SPONSOR: Lance Creek Water and Sewer District
LOCATION: Niobrara County
PROGRAM: Rehabilitation
APPROPRIATION: $327,900
ACTUAL EXPENDITURES: $327,900
DESCRIPTION: Pipeline, backflow prevention
ENGINEER: Western Water Consultants; Laramie, Wyoming
CONTRACTOR: Excel Construction, Inc.; Sheridan, Wyoming
88. PROJECT: Lander Worthen Meadows Dam Rehabilitation
SPONSOR: City of Lander
LOCATION: Fremont County
PROGRAM: Rehabilitation
APPROPRIATION: $1,250,000
ACTUAL EXPENDITURES: $811,804
DESCRIPTION: Dam repair
ENGINEER: Versar; Riverton, Wyoming
CONTRACTOR: C.J. Abbot; Casper, Wyoming
89. PROJECT: LaPrele Rehabilitation
SPONSOR: LaPrele Irrigation District
LOCATION: Converse County
PROGRAM: Rehabilitation
APPROPRIATION: $1,500,000
ACTUAL EXPENDITURES: $1,476,203
DESCRIPTION: Tunnel repair, canals
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Central Contractors, Inc.; Mills, Wyoming
90. PROJECT: Laramie Rehabilitation
SPONSOR: City of Laramie
LOCATION: Albany County
PROGRAM: Rehabilitation
APPROPRIATION: $1,750,000
ACTUAL EXPENDITURES: $1,546,216
DESCRIPTION: Rehabilitation of an existing storage facility,
Soldier springs well and pumphouse, and raw
water supply pipeline
ENGINEER: Western Water Consultants; Laramie, Wyoming
Wester-Wetstein & Associates; Laramie, Wyoming
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
Johnson Well Service, Laramie, Wyoming
High Plains Construction; Casper, Wyoming
Domino Construction; Laramie, Wyoming
91. PROJECT: Laramie Rivers
SPONSOR: Pioneer Canal-Lake Hattie Irrigation District
LOCATION: Albany County
PROGRAM: Rehabilitation
APPROPRIATION: $165,000
ACTUAL EXPENDITURES: $165,000
DESCRIPTION: Refinanced existing loans
ENGINEER: NA
CONTRACTOR: NA
92. PROJECT: LeClair Irrigation Rehabilitation
SPONSOR: LeClair Irrigation District
LOCATION: Fremont County
PROGRAM: Rehabilitation
APPROPRIATION: $470,000
ACTUAL EXPENDITURES: $442,845
DESCRIPTION: Canal repairs
ENGINEER: Crank Company, Inc.; Kemmerer, Wyoming
CONTRACTOR: Foster Construction Company, Inc.;
Riverton, Wyoming
93. PROJECT: LeClair Lateral
SPONSOR: LeClair Irrigation District
LOCATION: Fremont County
PROGRAM: Rehabilitation
APPROPRIATION: $750,000
ACTUAL EXPENDITURES: $361,342
DESCRIPTION: Lateral open ditches replacement with pipelines
ENGINEER: Apex Surveying - R.D. Connell and Associates;
Riverton, Wyoming
CONTRACTOR: LeClair Irrigation District; Riverton, Wyoming
94. PROJECT: Lingle Water Supply System Rehabilitation
SPONSOR: Town of Lingle
LOCATION: Goshen County
PROGRAM: Rehabilitation
APPROPRIATION: $400,000
ACTUAL EXPENDITURES: $350,000
DESCRIPTION: Upgrade transmission pipelines
ENGINEER: BenchMark of Torrington, P.C.; Torrington, Wyoming
CONTRACTOR: Scott and Son, Inc.; Torrington, Wyoming
95. PROJECT: Little Snake Rehabilitation
SPONSOR: Little Snake Conservancy District
LOCATION: Carbon County
PROGRAM: Rehabilitation
APPROPRIATION: $2,700,000
ACTUAL EXPENDITURES: $2,700,000
DESCRIPTION: Diversion Dam Replacements and Canal Repairs
ENGINEER: States West Inc.; Cheyenne, Wyoming
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
96. PROJECT: Lovell Irrigation District Rehabilitation
SPONSOR: Lovell Irrigation District
LOCATION: Big Horn County
PROGRAM: Rehabilitation
APPROPRIATION: $820,000
ACTUAL EXPENDITURES: $749,958
DESCRIPTION: Canal Repairs
ENGINEER: Soil Conservation Service; Casper, Wyoming
CONTRACTOR: Nichols & Lewis, Inc.; Lovely, Wyoming
C. A. Wilson Construction Company; Cowley, Wyoming
Jerry's Irrigation and Drainage, Inc.; Powell, Wyoming
Dale Weaver, Inc.; Worland, Wyoming
97. PROJECT: Lusk Water Supply
SPONSOR: Town of Lusk
LOCATION: Niobrara County
PROGRAM: New Development
APPROPRIATION: $709,000
ACTUAL EXPENDITURES: $550,982
DESCRIPTION: Transmission pipelines, storage tank, pump, controls
ENGINEER: MK Centennial Engineering, Inc.; Cheyenne, Wyoming
CONTRACTOR: Western Municipal Construction, Inc.;
Billings, Montana
98. PROJECT: McKenney Water Supply
SPONSOR: McKenney I&S District
LOCATION: Campbell County
PROGRAM: New Development
APPROPRIATION: $140,000
ACTUAL EXPENDITURES: $109,107
DESCRIPTION: Transmission pipelines
ENGINEER: TSP TWO, Inc.; Gillette, Wyoming
CONTRACTOR: Larry's Inc.; Gillette, Wyoming
99. PROJECT: Lyman Springs Rehabilitation
SPONSOR: Town of Lyman
LOCATION: Uinta County
PROGRAM: Rehabilitation
APPROPRIATION: $255,000
ACTUAL EXPENDITURES: $255,000
DESCRIPTION: Springs renovation and pumping station
ENGINEER: Forsgren Associates, Inc.; Evanston, Wyoming
CONTRACTOR: X-it Construction, Inc.; Lyman, Wyoming
S.C.I. Inc.; Lyman, Wyoming
100. PROJECT: Manville Water Supply
SPONSOR: Town of Manville
LOCATION: Niobrara County
PROGRAM: New Development
APPROPRIATION: $69,000
ACTUAL EXPENDITURES: $67,104
DESCRIPTION: New well and supply pipeline
ENGINEER: Western Water Consultants; Laramie, Wyoming
CONTRACTOR: Landkammer Trenching; Lance Creek, Wyoming
101. PROJECT: Means Water Supply
SPONSOR: Means First Extension W&S District
LOCATION: Campbell County
PROGRAM: New Development
APPROPRIATION: $225,000
ACTUAL EXPENDITURES: $212,253
DESCRIPTION: Pump station improvements, storage tank, and
transmission pipeline
ENGINEER: Bruce Engineering Services; Gillette, Wyoming
CONTRACTOR: DRM, Inc.; Gillette, Wyoming
102. PROJECT: Midvale Sand Mesa Pipeline
SPONSOR: Midvale Irrigation District
LOCATION: Fremont County
PROGRAM: Rehabilitation
APPROPRIATION: $3,000,000
ACTUAL EXPENDITURES: $2,900,879
DESCRIPTION: Gravity pressure irrigation delivery pipeline
ENGINEER: Natural Resources Conservation Service
R. D. Connell & Associates; Riverton, Wyoming
CONTRACTOR: Midvale Irrigation District
103. PROJECT: Midwest Rehabilitation
SPONSOR: Town of Midwest
LOCATION: Natrona County
PROGRAM: Rehabilitation
APPROPRIATION: $100,000
ACTUAL EXPENDITURES: $100,000
DESCRIPTION: Pipeline
ENGINEER: Geocivil Engineers, Inc.; Casper, Wyoming
CONTRACTOR: La Max Construction; Basin, Wyoming
104. PROJECT: Moorcroft Water Supply
SPONSOR: Town of Moorcroft
LOCATION: Crook County
PROGRAM: New Development
APPROPRIATION: $930,000
ACTUAL EXPENDITURES: $853,767
DESCRIPTION: Wells, pipeline, and storage tank
ENGINEER: Weston Engineering; Upton, Wyoming
CONTRACTOR: Hot Iron, Inc.; Gillette, Wyoming
Williams Drilling Co.; Gillette, Wyoming
105. PROJECT: Muddy Guard
SPONSOR: North Fork Irrigation District
LOCATION: Johnson County
PROGRAM: New Development
APPROPRIATION: $600,000
ACTUAL EXPENDITURES: $600,000
DESCRIPTION: Purchase of minimum pool in storage
ENGINEER: NA
CONTRACTOR: NA
106. PROJECT: North Fork Crazy Woman Rehabilitation
SPONSOR: Crazy Woman Watershed Improvement District
LOCATION: Johnson County
PROGRAM: Rehabilitation
APPROPRIATION: $650,000
ACTUAL EXPENDITURES: $471,366
DESCRIPTION: Canal improvements, pipeline
ENGINEER: HKM Associates; Sheridan, Wyoming
CONTRACTOR: S&S Builders; Gillette, Wyoming
Mollinax Concrete Service Company;
Sheridan, Wyoming
107. PROJECT: North Platte Gages
SPONSOR: State Engineer's Office
LOCATION: Carbon, Converse, Goshen and Natrona Counties
PROGRAM: Rehabilitation
APPROPRIATION: $850,000
ACTUAL EXPENDITURES: $790,000 (approx)
DESCRIPTION: Six (6) major stream gaging stations on the
North Platte River and tributaries
ENGINEER: States West Water Resources; Cheyenne, Wyoming
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
High County Construction; Casper, Wyoming
Rieman Construction; Cheyenne, Wyoming
Structures, Inc.; Riverton, Wyoming
108. PROJECT: Osage Water Supply
SPONSOR: Osage Water District
LOCATION: Weston County
PROGRAM: New Development
APPROPRIATION: $1,205,000
ACTUAL EXPENDITURES: $954,951
DESCRIPTION: Pipeline, storage, disinfection, pump, controls
ENGINEER: Weston Engineering, Inc.; Upton, Wyoming
CONTRACTOR: DRM, Inc.; Gillette, Wyoming
109. PROJECT: Park Reservoir Dam
SPONSOR: Park Reservoir Company
LOCATION: Sheridan County
PROGRAM: New Development
APPROPRIATION: $3,750,000
ACTUAL EXPENDITURES: $3,725,000
DESCRIPTION: Dam
ENGINEER: Woodward Clyde Consultants; Denver, Colorado
CONTRACTOR: McIntyre Construction; Great Falls, Montana
110. PROJECT: Pavillion Water Supply
SPONSOR: Town of Pavillion
LOCATION: Fremont County
PROGRAM: New Development
APPROPRIATION: $400,000
ACTUAL EXPENDITURES: $300,000
DESCRIPTION: Well, storage tank, and pipeline
ENGINEER: Rolly Connell & Associates; Riverton, Wyoming
CONTRACTOR: Rieman Construction; Cheyenne, Wyoming
Rawhide Mechanical; Riverton, Wyoming
111. PROJECT: Pine Bluffs Well Rehabilitation
SPONSOR: Town of Pine Bluffs
LOCATION: Laramie County
PROGRAM: Rehabilitation
APPROPRIATION: $155,000
ACTUAL EXPENDITURES: $132,723
DESCRIPTION: Well rehabilitation
ENGINEER: Lidstone & Associates, Inc.; Fort Collins, Colorado
CONTRACTOR: Sargent Irrigation Company; Scottsbluff, Nebraska
112. PROJECT: Pinedale Pipeline
SPONSOR: Town of Pinedale
LOCATION: Sublette County
PROGRAM: New Development
APPROPRIATION: $320,000
ACTUAL EXPENDITURES: $202,974
DESCRIPTION: Transmission pipeline
ENGINEER: Rio Verde; Pinedale, Wyoming
CONTRACTOR: Snyder Construction; Lyman, Wyoming
113. PROJECT: Pinedale Transmission Line
SPONSOR: Town of Pinedale
LOCATION: Sublette County
PROGRAM: New Development
APPROPRIATION: $3,550,000
ACTUAL EXPENDITURES: $2,974,131
DESCRIPTION: Transmission pipeline
ENGINEER: Rio Verde Engineering; Pinedale, Wyoming
CONTRACTOR: Snyder Construction, Inc.; Lyman, Wyoming
114. PROJECT: Pine Haven Water Supply
SPONSOR: Town of Pine Haven
LOCATION: Crook County
PROGRAM: New Development
APPROPRIATION: $165,000
ACTUAL EXPENDITURES: $97,162
DESCRIPTION: Pipeline, storage tank
ENGINEER: Bearlodge Engineering; Sundance, Wyoming
CONTRACTOR: Sundance Construction; Newcastle, Wyoming
115. PROJECT: Pioneer Canal
SPONSOR: Pioneer Canal-Lake Hattie Irrigation District
LOCATION: Albany County
PROGRAM: Rehabilitation
APPROPRIATION: $1,400,000
ACTUAL EXPENDITURES: $1,270,195
DESCRIPTION: Repairs to canal structures and diversion on
Little Laramie
ENGINEER: Western Water Consultants; Laramie, Wyoming
CONTRACTOR: Barlett Inc.; Hanna, Wyoming
Domson Inc.; Torrington, Wyoming
116. PROJECT: Poison Spider Water Supply
SPONSOR: Poison Spider Improvement & Service Dist.
LOCATION: Natrona County
PROGRAM: New Development
APPROPRIATION: $640,000
ACTUAL EXPENDITURES: $538,076
DESCRIPTION: Pipelines, metering, chlorination
ENGINEER: Civil Engineering Professionals; Casper
CONTRACTOR: Hedquist Construction, Inc.; Casper, Wyoming
117. PROJECT: Porto Canal
SPONSOR: Porto Canal Irrigation District
LOCATION: Lincoln County
PROGRAM: Rehabilitation
APPROPRIATION: $808,000
ACTUAL EXPENDITURES: $681,040
DESCRIPTION: Converting open ditch to pipeline
ENGINEER: Sunrise Engineering; Afton, Wyoming, Laramie, Wyoming
CONTRACTOR: H-K Construction; Idaho Falls, Idaho
118. PROJECT: Rawlins Groundwater Supply
SPONSOR: City of Rawlins
LOCATION: Carbon County
PROGRAM: New Development
APPROPRIATION: $8,200,000
ACTUAL EXPENDITURES: $7,505,939
DESCRIPTION: Wells, pipeline
ENGINEER: J.M. Montgomery; Laramie, Wyoming
CONTRACTOR: Several
119. PROJECT: Rawlins Springs Rehabilitation
SPONSOR: City of Rawlins
LOCATION: Carbon County
PROGRAM: Rehabilitation
APPROPRIATION: $220,000
ACTUAL EXPENDITURES: $55,722
DESCRIPTION: Springs enhancement
ENGINEER: J.M. Montgomery; Laramie, Wyoming
CONTRACTOR: City of Rawlins
120. PROJECT: Riverside
SPONSOR: Sierra Madre Water & Sewer Joint Powers Board
LOCATION: Carbon County
PROGRAM: New Development
APPROPRIATION: $1,225,000
ACTUAL EXPENDITURES: $834,574
DESCRIPTION: Municipal water supply
ENGINEER: PMPC; Saratoga, Wyoming
CONTRACTOR: Bartlett Construction; Hanna, Wyoming
121. PROJECT: Riverton Valley
SPONSOR: City of Riverton/Riverton Valley Irrigation District
LOCATION: Fremont County
PROGRAM: Rehabilitation
APPROPRIATION: $5,750,000
ACTUAL EXPENDITURES: $5,743,436
DESCRIPTION: Canal, pipeline
ENGINEER: R.D. Connell and Associates; Riverton, Wyoming
CONTRACTOR: Larry's Inc.; Gillette, Wyoming
122. PROJECT: Riverton Valley Laterals
SPONSOR: City of Riverton/Riverton Valley Irrigation District
LOCATION: Fremont County
PROGRAM: Rehabilitation
APPROPRIATION: $350,000
ACTUAL EXPENDITURES: $348,544
DESCRIPTION: Canal, pipeline
ENGINEER: R.D. Connell and Associates; Riverton, Wyoming
CONTRACTOR: City of Riverton/Riverton Valley Irrigation
District; Riverton, Wyoming
123. PROJECT: Riverton Water Supply
SPONSOR: City of Riverton
LOCATION: Fremont County
PROGRAM: New Construction
APPROPRIATION: $312,000
ACTUAL EXPENDITURES: $283,106
DESCRIPTION: Well and Transmission Pipeline
ENGINEER: Wester-Wetstein & Assoc., Inc.; Laramie, Wyoming
CONTRACTOR: Patrick Construction
124. PROJECT: Rock Springs/Green River Area Supply
SPONSOR: GR-RS-SC JPWB
LOCATION: Sweetwater County
PROGRAM: New Development
APPROPRIATION: $27,000,000
ACTUAL EXPENDITURES: $27,000,000
DESCRIPTION: Transmission Line, Storage, Pumping, Controls
125. PROJECT: Rock Springs/Green River Area Supply
SPONSOR: GR-RS-SC JPWB
LOCATION: Sweetwater County
PROGRAM: New Development
APPROPRIATION: $27,000,000
ACTUAL EXPENDITURES: $27,000,000
DESCRIPTION: Transmission Line, Storage, Pumping, Controls
ENGINEER: Forsgren Engineering; Evanston, Wyoming
Crank Companies; Kemmerer, Wyoming
CONTRACTOR: DeBernardi Construction; Rock Springs, Wyoming
Snyder Construction; Lyman, Wyoming
H-K Construction; Idaho Falls, Idaho
High Pains Construction; Casper, Wyoming
Resource Engineering; Rock Springs, Wyoming
C M E; Green River, Wyoming
ENGINEER: Forsgren Engineering; Evanston, Wyoming
Crank Companies; Kemmerer, Wyoming
CONTRACTOR: DeBernardi Construction; Rock Springs, Wyoming
Snyder Construction; Lyman, Wyoming
H-K Construction; Idaho Falls, Idaho
High Pains Construction; Casper, Wyoming
Resource Engineering; Rock Springs, Wyoming
C M E; Green River, Wyoming
126. PROJECT: Rolling Hills Water Supply
SPONSOR: Town of Rolling Hills
LOCATION: Converse
PROGRAM: New Development
APPROPRIATION: $282,000
ACTUAL EXPENDITURES: $221,878
DESCRIPTION: New Tank and Transmission Lines
ENGINEER: R.C.H and Associates; Glenrock, Wyoming
CONTRACTOR: CVIC, Casper; Phipps, Glenrock;
D.C. Drilling; Lusk, Wyoming;
Bartlett; Hanna, Wyoming
127. PROJECT: Sahara Rehabilitation
SPONSOR: Powder River Irrigation District
LOCATION: Johnson County
PROGRAM: Rehabilitation
APPROPRIATION: $900,000
ACTUAL EXPENDITURES: $900,000
DESCRIPTION: Diversion structure, canal improvements
ENGINEER: Western Water Consultants; Sheridan, Wyoming
CONTRACTOR: Foster Construction; Riverton, Wyoming
128. PROJECT: Shell Canal
SPONSOR: Shell Valley Watershed Improvement District
LOCATION: Big Horn County
PROGRAM: Rehabilitation
APPROPRIATION: $190,000
ACTUAL EXPENDITURES: $190,000
DESCRIPTION: Canal repairs
ENGINEER: Soil Conservation Service; Worland, Wyoming
CONTRACTOR: Big Horn Ready Mix, Inc.; Greybull, Wyoming
129. PROJECT: Shell Valley/Greybull Water Supply
SPONSOR: Town of Greybull
LOCATION: Big Horn County
PROGRAM: New Development
APPROPRIATION: $666,400
ACTUAL EXPENDITURES: $521,291
DESCRIPTION: Wells, pipeline
ENGINEER: Crank Company; Kemmerer, Wyoming
CONTRACTOR: Continental Construction; Jackson, Wyoming
130. PROJECT: Sheridan Area Water Supply
LEVEL: III
PROGRAM: New Development
SPONSOR: Sheridan Area Water Supply Joint Powers Board
LOCATION: Sheridan County
PROGRAM: New Development
APPROPRIATION: $37,206,000
ACTUAL EXPENDITURES: $37,206,000
DESCRIPTION: Enlargement of Twin Lakes Reservoir, Water
transmission facilities, Water treatment plant in
Big Goose Valley, Raw water transmission pipeline,
ENGINEER: Several
CONTRACTOR: Several (21 separate contracts)
131. PROJECT: Sheridan Intake Structure
SPONSOR: City of Sheridan
LOCATION: Sheridan County
PROGRAM: Rehabilitation
APPROPRIATION: $200,000
ACTUAL EXPENDITURES: $200,000
DESCRIPTION: Diversion dam
ENGINEER: TSP; Sheridan, Wyoming
CONTRACTOR: Husman Construction; Sheridan, Wyoming
132. PROJECT: Shoshone Municipal Pipeline
SPONSOR: Shoshone Municipal Water Supply Joint Powers Board
LOCATION: Park and Big Horn Counties
PROGRAM: New Development
APPROPRIATION: $38,750,000
ACTUAL EXPENDITURES: $38,451,942
DESCRIPTION: Pipeline, storage tanks, controls
ENGINEER: Banner Associates; Laramie, Wyoming
CONTRACTOR: Barcon; Sheridan, Wyoming
TIC; Casper, Wyoming
ASI Moltz; Cody, Wyoming
133. PROJECT: Shoshone Rehabilitation
SPONSOR: Shoshone Irrigation Project Joint Powers Board
LOCATION: Park/Big Horn Counties
PROGRAM: Rehabilitation
APPROPRIATION: $7,500,000
ACTUAL EXPENDITURES: $7,400,000
DESCRIPTION: Pipelines, canal structures, tunnel grouting,
siphon coating, headgate repair
ENGINEER: Graham, Dietz & Associates; Powell, Wyoming
Engineering Associates; Cody, Wyoming
Inberg-Miller Engineers; Powell, Wyoming
ESA; Bozeman, Montana
Engineering Science, Inc.; Salt Lake City, Utah
Water Resources Engineers; Powell, Wyoming
CONTRACTOR: LaMax Construction; Basin, Wyoming
Miller Fabrication; Lovell, Wyoming
Advanced American Diving; Oregon City, Oregon
Elkhorn Construction; Powell, Wyoming
Moltz Construction; Cody, Wyoming
Williams Plumbing & Heating; Bozeman, Montana
Excel Construction; Sheridan, Wyoming
Big Horn Ready-Mix; Greybull, Wyoming
MATERIALS: Elk River Concrete; Helena, Montana
A-C Supply; Basin, Wyoming
Boomers Irrigation; Powell, Wyoming
J&E, Inc.; Greybull, Wyoming
TNT Irrigation, Inc.; Powell, Wyoming
134. PROJECT: Shoshoni Water Supply
SPONSOR: Town of Shoshoni
LOCATION: Fremont County
PROGRAM: Rehabilitation
APPROPRIATION: $740,000
ACTUAL EXPENDITURES: $660,066
DESCRIPTION: Well replacement, water storage improvements
ENGINEER: Civil Engineering Professionals, Inc.;
Casper, Wyoming
CONTRACTOR: 71 Construction, Inc.; Casper, Wyoming
135. PROJECT: Sidon Canal Rehabilitation
SPONSOR: Sidon Irrigation District
LOCATION: Big Horn County
PROGRAM: Rehabilitation
APPROPRIATION: $1,060,000
ACTUAL EXPENDITURES: $730,260
DESCRIPTION: Diversion Headgate, Inverted Siphons
ENGINEER: Inberg Miller Engineers; Riverton, Wyoming
CONTRACTOR: Excel Construction, Inc.; Sheridan, Wyoming
136. PROJECT: Sinnard Dam
SPONSOR: Horse Creek Conservation District
LOCATION: Goshen County
PROGRAM: Rehabilitation
APPROPRIATION: $1,100,000
ACTUAL EXPENDITURES: $918,814
DESCRIPTION: Dam and outlet works
ENGINEER: ECI; Englewood, Colorado
CONTRACTOR: Domino Construction; Laramie, Wyoming
137. PROJECT: Sleepy Hollow Well Replacement
SPONSOR: Central Campbell County I&S District
LOCATION: Campbell County
PROGRAM: Rehabilitation
APPROPRIATION: $375,000
ACTUAL EXPENDITURES: $227,811
DESCRIPTION: Replacement of well, pump, controls, pipe
ENGINEER: Soda Butte Services; Upton, Wyoming
CONTRACTOR: Williams Drilling; Gillette, Wyoming
Hladky Construction; Gillette, Wyoming
138. PROJECT: Smiths Fork Water Supply
SPONSOR: Smiths Fork Irrigation District
LOCATION: Lincoln County
PROGRAM: Rehabilitation
APPROPRIATION: $340,000
ACTUAL EXPENDITURES: $307,027
DESCRIPTION: Diversion structure, headgate replacement
and siphon
ENGINEER: Versar; Denver, Colorado
CONTRACTOR: Reiman Construction; Cheyenne, Wyoming
139. PROJECT: Smoot Water Supply
SPONSOR: Greater Smoot Water and Sewer District
LOCATION: Lincoln County
PROGRAM: New Development
APPROPRIATION: $1,100,000
ACTUAL EXPENDITURES: $1,040,298
DESCRIPTION: Well, storage tank, spring improvements, pipeline
ENGINEER: Forsgren Associates; Evanston, Wyoming
CONTRACTOR: JASCO; Evanston, Wyoming
140. PROJECT: South of Laramie Water Supply
SPONSOR: South of Laramie Water and Sewer District
LOCATION: Albany County
PROGRAM: New Development
APPROPRIATION: $3,146,400
ACTUAL EXPENDITURES: $1,771,887
DESCRIPTION: Storage tank, city connection, pipeline, controls
ENGINEER: Banner Associates; Laramie, Wyoming
CONTRACTOR: Hedquist Construction; Casper, Wyoming
141. PROJECT: Southwest Casper Water Supply
SPONSOR: City of Casper
LOCATION: Natrona County
PROGRAM: New Development
APPROPRIATION: $1,000,000
ACTUAL EXPENDITURES: $1,000,000
DESCRIPTION: Storage Tank and Pipeline
ENGINEER: Worthington Lenhart, Carpenter, Inc.
CONTRACTOR: Lobo, Inc.; Casper, Wyoming
142. PROJECT: Spring Draw Ditch
SPONSOR: Spring Draw Irrigation District
LOCATION: Sheridan County
PROGRAM: Rehabilitation
APPROPRIATION: $350,000
ACTUAL EXPENDITURES: $282,924
DESCRIPTION: Ditch reclamation, and pipeline installation
ENGINEER: Pilch Engineering; Sheridan, Wyoming
CONTRACTOR: Larrys Inc.; Gillette, Wyoming
143. PROJECT: Squaw Creek Water Supply
SPONSOR: Squaw Creek Water District
LOCATION: Teton County
PROGRAM: New Development
APPROPRIATION: $580,000
ACTUAL EXPENDITURES: $530,297
DESCRIPTION: Wells, pipeline, storage
ENGINEER: AVI, Cheyenne, Wyoming
CONTRACTOR: G. M. Stewart Construction; Evanston, Wyoming
Thomas Brothers Drilling; Afton, Wyoming
144. PROJECT: Stage II Pipeline
SPONSOR: City of Cheyenne
LOCATION: Carbon, Albany, Laramie Counties
PROGRAM: New Development
APPROPRIATION: $48,200,000
ACTUAL EXPENDITURES: $47,713,214
DESCRIPTION: Pipeline
ENGINEER: Banner Associates, Inc.; Laramie, Wyoming
CONTRACTOR: Guernsey Stone; Sheridan, Wyoming
145. PROJECT: Sulphur Creek
SPONSOR: City of Evanston
LOCATION: Uinta County
PROGRAM: New Development
APPROPRIATION: $25,000,000
ACTUAL EXPENDITURES: $19,758,207
DESCRIPTION: Dam, pipelines (2)
ENGINEER: Several
CONTRACTOR: Several
146. PROJECT: Superior Water Supply
SPONSOR: Town of Superior
LOCATION: Sweetwater County
PROGRAM: New Development
APPROPRIATION: $40,000
ACTUAL EXPENDITURES: $30,880
DESCRIPTION: Groundwater well, pump station
ENGINEER: Wester-Wetstein & Associates; Laramie, Wyoming
CONTRACTOR: Ward's Well Service; Riverton, Wyoming
147. PROJECT: Teton Village Water Supply
SPONSOR: Teton Village Water and Sewer District
LOCATION: Teton County
PROGRAM: New Development
APPROPRIATION: $700,000
ACTUAL EXPENDITURES: $700,000
DESCRIPTION: Two wells, pipeline
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Thomas Drilling; Afton, Wyoming
H-K Construction; Idaho Falls, Idaho
148. PROJECT: Upper Bluff Rehabilitation
SPONSOR: Upper Bluff Irrigation District
LOCATION: Washakie County
PROGRAM: Rehabilitation
APPROPRIATION: $436,000
ACTUAL EXPENDITURES: $399,913
DESCRIPTION: Pump stations (2), measuring devices, canal repairs
ENGINEER: Nelson Engineering; Jackson, Wyoming
CONTRACTOR: Big Horn Red-Mix; Greybull, Wyoming
149. PROJECT: Upper Hanover Water Supply
SPONSOR: Hanover Irrigation District
LOCATION: Washakie County
PROGRAM: Rehabilitation
APPROPRIATION: $1,200,000
ACTUAL EXPENDITURES: $1,086,100
DESCRIPTION: Wasteways, flumes, canal lining
ENGINEER: Donnell & Associates; Worland, Wyoeming
CONTRACTOR: Big Horn Red-Mix; Greybull, Wyoming
Pope Construction; Casper, Wyoming
150. PROJECT: Upper Little Warm Springs Water Supply
SPONSOR: Warm Springs Water District
LOCATION: Fremont County
PROGRAM: New Development
APPROPRIATION: $1,600,000
ACTUAL EXPENDITURES: $1,426,485
DESCRIPTION: Pipelines, pumps, storage tank, controls
ENGINEER: Jorgensen Engineering; Jackson, Wyoming
CONTRACTOR: Foster Construction; Riverton, Wyoming
151. PROJECT: Upton Water Supply
SPONSOR: Town of Upton
LOCATION: Weston County
PROGRAM: New Development
APPROPRIATION: $365,000
ACTUAL EXPENDITURES: $328,375
DESCRIPTION: Well and pipeline
ENGINEER: Weston Engineering; Upton, Wyoming
High Plains Engineering; Newcastle, Wyoming
CONTRACTOR: Cyclone Drilling; Gillette, Wyoming
Sundance P&H; Sundance, Wyoming
152. PROJECT: Vista West Water Supply
SPONSOR: Vista West Water and Sewer District
LOCATION: Crook County
PROGRAM: New Development
APPROPRIATION: $540,000
ACTUAL EXPENDITURES: $523,135
DESCRIPTION: Wells, pipeline, storage
ENGINEER: Weston Engineering, Upton, Wyoming
CONTRACTOR: Dan Hart Patrol; Upton, Wyoming
Water System Management; Gillette, Wyoming
153. PROJECT: Wheatland Reservoir No. 1
SPONSOR: Wheatland Irrigation District
LOCATION: Platte County
PROGRAM: Rehabilitation
APPROPRIATION: $392,000
ACTUAL EXPENDITURES: $80,288
DESCRIPTION: Dam rehabilitation
ENGINEER: States West Water Resources Corporation;
Cheyenne, Wyoming
CONTRACTOR: Lamax Construction; Basin, Wyoming
154. PROJECT: Wild Rose Water Supply
SPONSOR: Wild Rose Service and Improvement District
LOCATION: Sheridan County
PROGRAM: Rehabilitation
APPROPRIATION: $126,000
ACTUAL EXPENDITURES: $126,000
DESCRIPTION: Canal, pipeline, reservoir
ENGINEER: Centennial Engineering; Sheridan, Wyoming
CONTRACTOR: Fletcher Construction; Sheridan, Wyoming
155. PROJECT: Willwood Dam Rehabilitation
SPONSOR: Willwood Irrigation District
LOCATION: Park County
PROGRAM: Rehabilitation
APPROPRIATION: $480,000
ACTUAL EXPENDITURES: $305,111
DESCRIPTION: Dam repairs
ENGINEER: Engineering Associates; Cody, Wyoming
CONTRACTOR: Cop Construction; Billings, Montana
156. PROJECT: Wright Water Supply
SPONSOR: Town of Wright
LOCATION: Campbell County
PROGRAM: New Development
APPROPRIATION: $450,000
ACTUAL EXPENDITURES: $231,591
DESCRIPTION: Well, pipeline
ENGINEER: J.M. Montgomery; Laramie, Wyoming
CONTRACTOR: Larry's Inc.; Gillette, Wyoming
157. PROJECT: Wright Water Supply
SPONSOR: Wright Water and Sewer District
LOCATION: Campbell County
PROGRAM: Rehabilitation
APPROPRIATION: $50,000
ACTUAL EXPENDITURES: $50,000
DESCRIPTION: Well and pipe rehabilitation
ENGINEER: Bruce Engineering; Gillette, Wyoming
CONTRACTOR: Weston Groundwater Engineering; Upton, Wyoming
158. PROJECT: Yoder Water Supply
SPONSOR: Town of Yoder
LOCATION: Goshen County
PROGRAM: New Development
APPROPRIATION: $577,200
ACTUAL EXPENDITURES: $433,391
DESCRIPTION: Pump facilities and transmission pipeline
ENGINEER: Banner Associates; Laramie, Wyoming
CONTRACTOR: Interstate Irrigation; Yuma, Colorado
159. PROJECT: Yoder Water Well
SPONSOR: Town of Yoder
LOCATION: Goshen County
PROGRAM: New Development
APPROPRIATION: $30,000
ACTUAL EXPENDITURES: $14,722
DESCRIPTION: Drilled a well
ENGINEER: Wells Engineering; Lusk, Wyoming
CONTRACTOR: Midwest Farm Service; Scottsbluff, Nebraska
|