Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2001 LEGISLATIVE REPORT
Active Projects

 59. PROJECT:Lakeview Improvement and Service District Water Supply
LEVEL:III
SPONSOR:Lakeview Improvement and Service District
LOCATION:Natrona County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 82 1999 I $25,000 2000
Level III 96 2000 I $390,000 2004

PROJECT INFORMATION:
There are approximately 70 residents living in the Lakeview Improvement and Service District with approximately 29 potential taps in the district. Private wells of most Lakeview residents provide poor quality ground water high in nitrates, sulfates, and selenium. Consequently, most residents haul water from town. In order to provide Lakeview residents with suitable drinking water, the Lakeview Service and Improvement District would like to construct an 8-inch PVC water supply pipeline system for their district which would tie into an existing Central Wyoming Regional Water System 16 inch transmission line.

The legislature appropriated $390,000 to connect the district to the Central Wyoming Regional System. A bond election was held November 7, 2000, to allow the district to incur the necessary debt to construct the system. Civil Engineering Professionals Incorporated of Casper has been retained to do the design and construction engineering. Currently the project schedule calls for completion in fall of 2002.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.