Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2001 LEGISLATIVE REPORT
Active Projects
62. | PROJECT: | Laramie North Side Supply | | | | | |
| LEVEL: | II |
| SPONSOR: | City of Laramie |
| LOCATION: | Albany County |
| PROGRAM: | Rehabilitation |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level II |
36 |
2000 |
II |
$45,000 |
2002 |
|
PROJECT INFORMATION:
The 1994 Master Plan study evaluated various options for expanding Laramie's water supply,
storage, treatment, transmission and distribution system to meet expanding demands. The study
recommended a long-term schedule for improving both the surface and groundwater supply
systems. Recommendations were made for Level III construction funding from both the New
Development and Rehabilitation accounts.
The 1995 New Development Program recommendation addressed the conversion of an existing test
well to production status and the construction of monitoring wells at the LaPrele site. This work
has been completed. The 1996 recommendation provided for the construction of two production
wells at the Spur site, a pipeline to connect the well field to the city distribution system, and a new
storage tank. In 1997 the two Spur wells were drilled, developed, and an extensive pump test was
conducted. The 2000 legislature authorized the city of Laramie to expand the 1995 Level I study to
include the evaluation of a portion of the 20 inch pipeline south and west of town, to combine the
East Side Tank and Corthell Hill Pipeline projects, and to add a North Side Transmission Line
reconnaissance level investigation. This study recommends that the town of Laramie rehabilitate
the previously mentioned 20 inch section of pipeline south and west of town, and add a tank and
transmission lines east of town to provide water for the Corthell Hill and Altavista areas. The city
of Laramie has proposed a schedule for these projects that would be finished in 2006. This year the
town of Laramie is asking for funding for Level III final design work and right of way acquisition
on the two selected projects at a cost of $970,000. Project design and cost estimates are as follows
in 2002 dollars.
Pipeline Rehabilitation |
Project Cost | $2,900,000 |
Design Portion | $230,000 |
Tank & Transmission Lines |
Project Cost | $11,190,000 |
Design Portion | $740,000 |
Total Project Costs | $14,090,000 |
Design Total | $970,000 |
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the Rehabilitation Program at Level III
with an appropriation of $970,000. The financing plan includes a 50% grant, ($485,000) and a 50%
loan, ($485,000) at 7.25% interest for 20 years.
|