Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2001 LEGISLATIVE REPORT
Active Projects

 76. PROJECT:Natrona County Regional Rehabilitation
LEVEL:III
SPONSOR:Natrona County Regional Water System Joint Powers Board
LOCATION:Natrona County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III-I 206 1995 II $1,500,000* 1999
Level III-II 59 1996 II $3,800,000* 1999
Level III-III 38 1998 II $57,000* 2002
*50% grant, 50% loan (4%, 30 years)

PROJECT INFORMATION:
The aggregate population of the entities served by the Natrona County Regional Water System Joint Powers Board is approximately 60,000 residents. The Level II feasibility study of the Natrona County Regional Water Supply Project identified $60,000,000 of needed improvements, of which $37,000,000 would be eligible for WWDC assistance, and identified a phased approach for completing the project. Some infrastructure improvements should be completed by 1997 to facilitate operation of the regional system.

The Level II feasibility study of the Natrona County Regional Water Supply Project recommended that the Fort Caspar and Dempsey Acres well fields be rehabilitated. The estimated cost for this component of the project is $4,814,000. The project will be completed in three phases: drilling, final design, and construction. The well fields are a primary water supply for the regional system. The existing wells are old and production has dropped. The project would serve to increase the well production to its permitted amount. In addition, several water storage tanks will be operated by the Joint Powers Board. Telemetry modifications to the tanks and some rehabilitation is required to extend their usable life. The estimated cost for the improvements to the storage tanks is $586,000. These project components are eligible for funding from the rehabilitation account. Because of limited funds available, the WWDC recommended that this project be phased.

The first phase of the well rehabilitation project has been constructed. The second phase is under construction and will be completed in the next two years. The rehabilitation of the storage tanks is currently under design. One of the tanks has been identified as needing a new inlet pipe to help prevent stagnation of the water in the tank.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.