Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2001 LEGISLATIVE REPORT
Active Projects
88. | PROJECT: | Pine Haven Master Plan | | | | | |
| LEVEL: | I |
| SPONSOR: | Town of Pine Haven |
| LOCATION: | Crook County |
| PROGRAM: | New Development |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
36 |
2000 |
I |
$35,000 |
2002 |
|
PROJECT DESCRIPTION:
The town of Pine Haven Water System Master Plan, completed in November of 2000 by Stetson
Engineering for WWDC, suggested several possible system expansion alternatives. With WWDC
funding assistance, the town wishes to pursue two Level III considerations, 1) a 6" pipeline to tie
the existing Keyhole No. 1 Well directly to the town's .25MG storage tank, and 2) an 8" "tank tie-in"
transmission line from the storage tank to the town's distribution system to enhance the system
reliability/redundancy and to provide looping from the storage facility.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the Rehabilitation Program at Level III
with an appropriation of $235,000. The financing plan is a 50% grant, $117,500 and a 50% loan,
$117,500, for thirty years at 7.25% interest.
|