Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2001 LEGISLATIVE REPORT
Active Projects

 90. PROJECT:Powell Master Plan
LEVEL:I
SPONSOR:Town of Powell
LOCATION:Park County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 36 2000 II $45,000 2002

PROJECT INFORMATION:
The city of Powell would like to move forward with the recommended improvements to their water system as outlined in the Level I study funded by the WWDC in 2000. The Level I study recommended replacing the old 75,000 gallon elevated storage tank with a 400,000 elevated tank in the southwest part of town. This new storage tank will meet the storage needs of Powell well into the future.

A new pressure zone is needed in Powell to increase marginal pressures in the western part of town. Four pressure reducing valves and associated piping are also needed to complete the pressure zone.

This current application is to finance phase 1 of a 3 phase project. Phase 1 consists of design and specifications of the remaining two phases, completing the permitting and mitigation work, legal fees and access and rights-of-way. Phase 2 will include the pressure reducing valves and piping construction; phase 3 will be the storage tank and telemetry.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the Rehabilitation Program at Level III with an appropriation of $127,000. The financing plan is a 50% grant, $127,000, and a 50% loan, $127,000, to be secured by the sponsor through other sources.