Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2002 LEGISLATIVE REPORT
Active Projects
21. | PROJECT: | Casper Zone 2 | | | | | |
| LEVEL: | Level II |
| SPONSOR: | City of Casper |
| LOCATION: | Natrona County |
| PROGRAM: | New Development |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level II |
86 |
2001 |
I |
$60,000 |
2002 |
|
PROJECT INFORMATION:
Due to the rapid growth in Casper and most notable in the East Zone II area, the city would like to
expand its storage and transmission facilities that serve the area. There have been two studies in the
past in this area. However, rapid growth has changed the demands since that time. Civil
Engineering Professional Inc. were retained to conduct the Level II analysis of the project. The
study identified numerous infrastructure improvements that should be made by the City. The City
has selected a development plan that includes new pipelines and storage facilities in the Eastern part
of the City.
The design and construction costs are displayed below:
Design: | |
Final Plans and Specifications | $229,900.00 |
Permitting and Mitigation | $ 15,000.00 |
Legal Fees | $ 6,000.00 |
Access and Right-of-way | $ 29,000.00 |
Subtotal | $279,900.00 |
| |
Construction: | |
Pipelines | $1,856,700.00 |
Storage Tanks | $1,051,400.00 |
Subtotal | $2,908,100.00 |
Total Project Cost | $3,188,000.00
|
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the New Development Program at Level III
with an appropriation of $3,188,000.00. The financing plan includes a 50% grant, ($1,594,000) and
a 50% loan, ($1,594,000) at 7.25% interest for 20 years.
|