Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

 21. PROJECT:Casper Zone 2
LEVEL:Level II
SPONSOR:City of Casper
LOCATION:Natrona County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 86 2001 I $60,000 2002

PROJECT INFORMATION:
Due to the rapid growth in Casper and most notable in the East Zone II area, the city would like to expand its storage and transmission facilities that serve the area. There have been two studies in the past in this area. However, rapid growth has changed the demands since that time. Civil Engineering Professional Inc. were retained to conduct the Level II analysis of the project. The study identified numerous infrastructure improvements that should be made by the City. The City has selected a development plan that includes new pipelines and storage facilities in the Eastern part of the City.

The design and construction costs are displayed below:

Design: 
Final Plans and Specifications$229,900.00
Permitting and Mitigation$ 15,000.00
Legal Fees$ 6,000.00
Access and Right-of-way$ 29,000.00
    Subtotal$279,900.00
  
Construction: 
Pipelines$1,856,700.00
Storage Tanks$1,051,400.00
    Subtotal$2,908,100.00
    Total Project Cost$3,188,000.00

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the New Development Program at Level III with an appropriation of $3,188,000.00. The financing plan includes a 50% grant, ($1,594,000) and a 50% loan, ($1,594,000) at 7.25% interest for 20 years.