Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2002 LEGISLATIVE REPORT
Active Projects
38. | PROJECT: | Encampment Raw Water Line | | | | | |
| LEVEL: | III |
| SPONSOR: | Town of Encampment |
| LOCATION: | Carbon County |
| PROGRAM: | Rehabilitation |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level II |
60 |
1982 |
I |
$150,000 |
1983 |
|
|
Level III* |
52 |
1984 |
I |
$60,000 |
1985 |
|
|
Level IV** |
167 |
1985 |
1 |
$200,000 |
*** |
|
|
Level III |
2 |
2001 |
II |
$60,000 |
2005 |
|
| *Level III in 1984 included only development of final plans and specifications. |
| **Level IV in 1985 included the authorization and funding of construction. |
| ***Chapter 167 did not include a reversion date. |
PROJECT INFORMATION:
The town of Encampment undertook construction of a new diversion facility and 1,800 feet of
transmission line in 1986. Encampment would now like to pursue phase two of that project and
enclose the remaining 6,200 feet of open ditch in a pipeline. The total project is estimated to cost
about 800,000 The 2001 appropriation was for final design and specifications for the project. The
sponsor has paid the loan portion of design expenses to date, so no loan funds have been disbursed
during the design phase. The current request is for fifty percent ($400,000) of the funding to
complete the project. Twenty-five percent ($200,000) of the project will be funded through RUS and
twenty-five percent ($200,000) by the Town of Encampment using Capital Facilities Tax funds.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the Rehabilitation Program at Level III
with a 50% grant appropriation of $400,000.
|