PROJECT INFORMATION:
The Greybull Valley Irrigation District would like to pursue a detailed cost analysis of placing
hydropower generators at the base of their three major reservoir dams. This study will also include a
study or the transmission requirements to get the generated power to a power user.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the Rehabilitation Program at Level II
with an appropriation of $60,000.