Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

 59. PROJECT:Highline Ditch
LEVEL:III
SPONSOR:Highline Watershed Improvement District
LOCATION:Carbon County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 81 1999 II $50,000   2000
Level III 96 2000 II $726,000* 2004
*50% grant; 50% loan (6%, 20 years)

PROJECT INFORMATION:
The project is located east of Saratoga within the proposed Highline Watershed Improvement District. The purpose of the Level II study was to address problems associated with erosion of several ditches. Head cut has not stabilized and is working upstream towards a concrete diversion structure. The county has moved the road once because of the danger and may have to move it again. The ditches are 30 plus feet deep and have combined because of the bank erosion.

A large number of irrigated acres are dependent on this water delivery system. These areas produces 2 to 3 tons of hay per irrigated acre and also supplies a large amount of forage for spring and fall grazing as well as a considerable amount of forage for area wildlife. The irrigation water delivery system is being threatened. A structure such as a pipe-drop is needed to prevent further erosion. Preliminary design work on this has been done in the past.

In 1999 the legislature approved $50,000 to evaluate the current condition of the Highline Ditch and other ditches in the irrigation system. The consultant, Anderson Consulting Engineers, Inc., determined that a set of new ditches with a series of drop structures in each would be the best option for the district to save their ditches.

The Highline Watershed Improvement District received a Level III appropriation of $726,000 (50% grant, 50% loan) in the year 2000 to rehabilitate washouts on the Highline, Ryan-Foreman, Wiant, and MaCannany ditches within the improvement district. A contract with PMPC Consulting Engineers of Saratoga was negotiated by the district for project design and construction management services. Phase I of the project, involving the Highline and Ryan-Foreman washouts, was designed and constructed during the year 2000. Phase II work on the MaCannany and Wiant ditches substantially completed in November 2001 and will be completed in Spring 2002 with reseeding activities.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.

   Citizen    Government    Business    Visitor   Privacy Policy