Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

 63. PROJECT:Lake DeSmet Master Plan and Reservoir Rehabilitation Plan
LEVEL:New Application
SPONSOR:Lake DeSmet Counties Coalition, Joint Powers Board
LOCATION:Johnson County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The Lake DeSmet Counties Coalition (LDCC) is requesting assistance with planning future water uses and evaluation of operation, maintenance, and rehabilitation needs of the reservoir. Assistance is needed in the following areas:

Master Planning;
Identify potential water uses and impacts,
Review water rights and correct any problems,
Conduct water quality investigation and determine potential impacts from CBM water discharges into the reservoir,
Determine the potential for hydropower generation,
Study economics associated with multiple uses, and
Evaluate the potential for additional access to the lake shoreline.

Reservoir Rehabilitation;
Conduct internal and external structural inspection of all facilities,
Conduct seepage investigations during a full condition,
Review the monitoring program,
Study up grading control structures and telemetry needs, and
Evaluate operation and maintenance needs and upgrade the O&M manual.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the Rehabilitation Program at Level II with an appropriation of $100,000.