Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2002 LEGISLATIVE REPORT
Active Projects

 88. PROJECT:Northeast Wyoming Interactive Database
LEVEL:I
SPONSOR:Wyoming Geological Survey
LOCATION:Northeast Wyoming
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 86 2001 I $400,000 2002

PROJECT INFORMATION:
The coalbed methane development in the Powder River Basin is currently one of the most active in the U.S., with more than 2,400 producing wells. These wells collectively produced 58.1 billion cubic feet of gas in 1999. There are also 1,300 shut-in wells capable of producing once they are connected to a pipeline. The average water production per well is approximately 12 gpm, which equates to approximately 40 mgd currently being discharged to the surface. Over 7,200 additional wells have been permitted in the last year, with BLM projecting that a total of 35,000 to 70,000 cbm wells may ultimately be completed.

The purpose of the proposed project is to generate an interactive database that will provide information on the surficial and subsurface geology, groundwater hydrology, and surface and subsurface water quality of part of the Powder River Basin. In addition, the project will include available information on water well completion reports. As the emphasis will be on the coalbed methane producing formations and beds in the area, links to information on coalbed methane production and produced water will also be available. This will be accomplished through cooperative efforts among the Wyoming Geological Survey, Water Resources Data System, United States Geological Survey Water Resources Division, Bureau of Land Management, Wyoming Oil and Gas Conservation Commission, Wyoming Water Development Commission, Wyoming Department of Environmental Quality, and the Wyoming State Engineer's Office.

The project is proposed to be completed by October 2002, with subsequent appropriation requests for the other basins in the State.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action required.

   Citizen    Government    Business    Visitor   Privacy Policy