Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2002 LEGISLATIVE REPORT
Active Projects
93. | PROJECT: | Pine Haven Madison Test Well | | | | | |
| LEVEL: | II |
| SPONSOR: | Town of Pine Haven |
| LOCATION: | Crook County |
| PROGRAM: | New Development |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
36 |
2000 |
I |
$35,000 |
2001 |
|
|
Level III |
2 |
2001 |
I |
$235,000 |
2004 |
|
PROJECT INFORMATION:
The "Town of Pine Haven Water System Master Plan," completed by Stetson Engineering in 2000,
recommended that a second source supply well be developed as a system expansion alternative. The
town currently has only one source of supply, the Keyhole No. 1 Well. If this well should fail, the
community would be out of water as soon as the storage tank emptied. To increase the reliability of
service to the water system, it would be advantageous to have a second supply well. A second well
would provide system redundancy and provide additional capacity as the town develops in the future.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the New Development program at Level II
with an appropriation of $575,000 for test well drilling.
|