Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2003 LEGISLATIVE REPORT
Legislative Program
The Water Development Commission utilizes the following process to generate funding recommendations for legislative consideration.
- New Applications
The deadline for new project applications is the fifteenth of September. Upon receipt, new
applications and supporting documentation are reviewed, and project sites are visited. The
WWDC makes preliminary recommendations regarding new applications at its November
meeting.
- Existing Projects
Typically, consultant project reports are drafted by the first of October. These reports are
reviewed to determine whether the projects warrant advancement in the program. At the
November WWDC meeting consultant reports are presented, which include a project budget and
financing plan. Project sponsors are given the opportunity to present their requests. The WWDC
director also presents his recommendation. The WWDC takes preliminary action on the
sponsor's request at this meeting.
- Public Meetings/Hearings
If a proposed Level I Reconnaissance Study or Level II Feasibility Study is of particular concern
or controversy, the WWDC may solicit public input at a public meeting prior to finalizing its
project recommendation. The Commission holds formal public hearings on all projects that are
proposed for Level III Final Design and Construction funding.
- Coordination with the Governor
The WWDC provides the Governor with its preliminary recommendations and a financial report
addressing impacts to the water development accounts. The Governor may provide input
throughout the recommendation process.
- Final Recommendations
The WWDC meets in December or early January to finalize its legislative recommendations on
new applications and existing projects. The Commission considers public input received at the
meetings and hearings and recommendations from the Governor. Sponsors and interested parties
who disagree with the Commission's preliminary recommendation are provided the opportunity
to address the Commission with their concerns.
- Select Water Committee
The Select Water Committee is comprised of 6 senators and 6 representatives. They provide
legislative oversight for the program, and review the Commission's recommendations and
budgets. Typically, the Select Water Committee serves as sponsors for the Water Development
Program legislation.
- Legislative Process
The legislature must authorize the allocation of funds from the water development accounts to
particular projects. This approval is solicited through the "Omnibus" Planning and Construction
Bills.
|