Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 40. PROJECT:Dubois Regional Water Supply
LEVEL:II
SPONSOR:Town of Dubois, Incorporated Municipality
LOCATION:Fremont County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 82 1998 I $75,000 2000
Level II 7 2002 I $75,000 2004

PROJECT INFORMATION:
In 1999 a WWDC Level I master water supply plan was completed for the Town of Dubois by Gores & Associates of Riverton. The study recommended that the town pursue a Level II feasibility study (preliminary design, cost estimation, funding planning) that concentrated on constructing a new well at the airport and siting a new water storage tank. Other improvements to be considered for construction funding were: 1) a new municipal supply well on the west side (near Well #8), 2) extending the municipal system to serve the Painted Hill Estates subdivision, which lies southeast of town, 3) replace defective distribution system valves, 4) replacing undersized mains, 5) looping dead end distribution lines, 6) installing additional fire hydrants in fire flow deficient portions of town, 7) replacing the tank level and pump control systems, 8) installing chlorinators at each supply well, and 9) implementing a more efficient system operating plan.

Since the completion of the Level I study, the town also has experienced an unexpected increase in water use. There are also recognized water supply deficiencies outside of town where future development will also need to be addressed. Therefore, the town wishes to revisit the growth scenario for the Dubois planning area and also explore regional source supply possibilities outside the existing town's alluvial well field.

A preliminary reconnaissance of Dubois' water supply system reveals the town's per capita use is much higher than the average Wyoming use per capita. Additional funding is being requested in order to conduct a leak detection survey. A budget increase is also requested to map the town's entire supply system by GPS technology.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project budget be increased at Level II in New Development by an additional appropriation of $20,000, for a new total appropriation of $95,000.