Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2003 LEGISLATIVE REPORT
Active Projects
40. | PROJECT: | Dubois Regional Water Supply | | | | | |
| LEVEL: | II |
| SPONSOR: | Town of Dubois, Incorporated Municipality |
| LOCATION: | Fremont County |
| PROGRAM: | New Development |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
82 |
1998 |
I |
$75,000 |
2000 |
|
|
Level II |
7 |
2002 |
I |
$75,000 |
2004 |
|
PROJECT INFORMATION:
In 1999 a WWDC Level I master water supply plan was completed for the Town of Dubois by
Gores & Associates of Riverton. The study recommended that the town pursue a Level II
feasibility study (preliminary design, cost estimation, funding planning) that concentrated on
constructing a new well at the airport and siting a new water storage tank. Other improvements to
be considered for construction funding were: 1) a new municipal supply well on the west side
(near Well #8), 2) extending the municipal system to serve the Painted Hill Estates subdivision,
which lies southeast of town, 3) replace defective distribution system valves, 4) replacing
undersized mains, 5) looping dead end distribution lines, 6) installing additional fire hydrants in
fire flow deficient portions of town, 7) replacing the tank level and pump control systems, 8)
installing chlorinators at each supply well, and 9) implementing a more efficient system operating
plan.
Since the completion of the Level I study, the town also has experienced an unexpected increase
in water use. There are also recognized water supply deficiencies outside of town where future
development will also need to be addressed. Therefore, the town wishes to revisit the growth
scenario for the Dubois planning area and also explore regional source supply possibilities
outside the existing town's alluvial well field.
A preliminary reconnaissance of Dubois' water supply system reveals the town's per capita use is
much higher than the average Wyoming use per capita. Additional funding is being requested in
order to conduct a leak detection survey. A budget increase is also requested to map the town's
entire supply system by GPS technology.
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project budget be increased at Level II in New Development by an
additional appropriation of $20,000, for a new total appropriation of $95,000.
|