Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 63. PROJECT:Jon's Drop/4-Mile Flume Rehabilitation Project
LEVEL:II
SPONSOR:West Side Canal Company/Savery-Little Snake Conservancy Dist.
LOCATION:Carbon County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 7 2002 II $25,000 2002

PROJECT INFORMATION:
The West Side Canal Company requested a Level II feasibility study to provide recommendations and cost estimates for rehabilitation of the Jons Drop and the 4-mile flume within the canal system. The Jons Drop is a chronic maintenance problem on the canal and is currently experiencing bank failure that may, if allowed to continue, disrupt water flow to irrigators below the drop. The 4-mile flume has reached its useful life expectancy and is in need of overhaul or replacement.

It was recommended that Jons Drop be rehabilitated by installing a HDPE pipe drop with a riprap energy dissipation pool. This drop will direct the flow away from the erosion area and to an area where flow can be controlled. It is recommended that 4-mile flume be replaced with an inverted siphon pipe.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated in the Rehabilitation Program and advanced to Level III construction with a proposed budget of $142,000. The appropriation will be 50% loan and 50% grant. The loan will be at 6% interest for a term of 20 years.