Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

 79. PROJECT:McNutt Water Supply
LEVEL:III
SPONSOR:McNutt Improvement District
LOCATION:Washakie County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 82 1998 I $25,000 2000

PROJECT INFORMATION:
The city of Worland installed a new water line to the Boy's School several years ago that passes very near to the sponsor's service area. At the time that line was constructed, the city installed a tap to accommodate the sponsor's future plans for a water system.

The sponsor requested assistance to complete a rural water system for their subdivision. A Level II study was performed in 1998 which shows the project to be feasible, and that monthly water bills will be approximately $50/tap/month. The total project cost is estimated at $165,000, with $102,000 of that amount eligible for WWDC participation. The sponsor has requested a 60/40 grant loan split, and 7.25% financing for 30 years.

There are currently about 45 people living in the service area, with a number of unoccupied lots. They predict there will be 20 taps on their system initially, and are confident that additional requests will be made for taps once the system moves forward. The sponsor currently utilizes individual wells of marginal quality, and septic systems.

The project has been incorporated into the Washakie Rural Water Supply Project, and advanced to Level III in the New Development Program with an appropriation of $60,000 as part of the appropriation for the Washakie Rural Water Supply project.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.