Agency Information
Mission Statement
Directory
Calendar
Commission Agendas & Minutes
Consultant Selection
Items Open for Public Comment
Newsletter
Operating Criteria
Project Application Information
Send Us Your Comments
Planning Program
Dam and Reservoir Planning
Groundwater Grant Projects
Instream Flow Filings
Current Planning Projects
River Basin Planning
Weather Modification Study
Probable Maximum Precipitation
Water Research Projects
Construction Program
Current Construction Projects
Small Water Projects
Agency Publications
Project Reports
Water/Climate Web Atlas
Irrigation & Water System Surveys
Legislative Reports
Water Mgmnt & Conservation Dir
History of Wyoming Water Law
WWDC Home Page
Water Plan Home Page
WRDS Home Page
|
2003 LEGISLATIVE REPORT
Active Projects
82. | PROJECT: | Moorcroft Well | | | | | |
| LEVEL: | II |
| SPONSOR: | Town of Moorcroft |
| LOCATION: | Crook County |
| PROGRAM: | New Development |
| |
| EXISTING LEGISLATION: |
|
Purpose |
Chapter |
Session |
Account |
Appropriation |
Due Date |
|
|
Level I |
38 |
1992 |
I |
$35,000 |
1992 |
|
|
Level II |
74 |
1994 |
I |
$225,000 |
1994 |
|
|
Level III |
28 |
1994 |
I |
$930,000 |
1997 |
|
|
Level II |
36 |
2000 |
I |
$355,000 |
2002 |
|
|
Level II |
86 |
2001 |
I |
$145,000 |
2002 |
|
PROJECT INFORMATION:
In 1992, a Level I study conducted for the town of Moorcroft recommended construction of a
new storage tank and connection piping collection system. The study also recommended that both
a Lance/Fox Hills Formation well and a Madison Formation well be developed. In 1994, after the
conclusion of a Level II study, the town of Moorcroft constructed the new storage tank, system
piping, and drilled a new Lance/Fox Hills test well. The Madison test well has also recently been
drilled.
The test well was completed in October of 2001 to a total depth of 3,750 feet into the Madison
Limestone aquifer. The well was constant-rate pump tested at 602 gpm over a seven-day period
with a resultant drawdown of 76 feet. This rate is over 5 times the present capacity of their
existing wells. The water quality is within primary drinking water standards but is extremely
hard (605 mg/L as CaCO3) and therefore some treatment will be required for specific uses. The
Town has applied for 2003 funding from WWDC and USDA-RUS. The test wells will be
connected to the Town's distribution system.
-
Estimated Level III Costs
Final Designs & Specifications | $ 265,817.20 |
Permitting & Mitigation | 11,150.00 |
Legal Fees | 4,000.00 |
Access & ROW | 82,210.00 |
Project Components | $ 2,658,172.00 |
Engineering | 265,817.20 |
Construction Cost (Subtotal) | $ 2,923,989.20 |
Contingency (15%) | 438,598.38 |
Construction Cost Total (Subtotal) | $ 3,362,587.58 |
| |
Project Total Construction Cost | $ 3,725,764.78 |
Project Total Cost (Rounded) | $ 3,750,000
|
Purchase Price of Moorcroft Madison #1 Well - $129,031.40
RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends the project be incorporated into the New Development Program at
Level III with an appropriation of $2,250,000 (60% Grant).
|