Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification Study
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Publications
 Project Reports
 Water/Climate Web Atlas
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

2003 LEGISLATIVE REPORT
Active Projects

110.PROJECT:Salt Creek Water Supply
LEVEL:III
SPONSOR:Salt Creek Water District
LOCATION:Weston County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 15 1996 I $100,000   1998
Level II 46 1997 I $500,000   2000
Level II 82 1998 I $140,000   2000
Level II 81 1999 I $420,000   2000
Level III 96 2000 I $690,000* 2004
*60% grant, 40% loan (7.25%, 30 years)

PROJECT INFORMATION:
The Salt Creek Water District wishes to make improvements to their existing system. The district also wishes to build pipelines to connect to a regional, Newcastle area system that was recommended in the 1999 Level II study. This project includes the district's purchase of the SCWD No. 1 Well drilled by WWDC in 1999 with directional drilling technology and completed in the Madison formation aquifer.

The Level III appropriation will finance purchase of the pump, plumbing, and controls to connect the SCWD No. 1 Well into the district's water delivery system. The appropriation will also finance construction of a pipeline to connect the well and to replace old transmission pipe.

Construction is underway on the well appurtenances and control building. Design is complete on the transmission pipeline, with construction and completion of the project anticipated in 2003.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.