Pioneer Canal and Laramie River by Tony Bergantino
Agency Information
 Mission Statement
 Directory
 Calendar
 Commission Agendas & Minutes
 Consultant Selection
 Items Open for Public Comment
 Newsletter
 Operating Criteria
 Project Application Information
 Send Us Your Comments

Planning Program
 Dam and Reservoir Planning
 Groundwater Grant Projects
 Instream Flow Filings
 Current Planning Projects
 River Basin Planning
 Weather Modification
 Probable Maximum Precipitation
 Water Research Projects

Construction Program
 Current Construction Projects
 Small Water Projects

Agency Products
 Project Reports
 Interactive Maps
 Wyoming Reservoirs Status
 Irrigation & Water System Surveys
 Legislative Reports
 Water Mgmnt & Conservation Dir
 History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

Proposed Changes to WWDC Rules


Changes are proposed to Chapters 1 through 6 to simplify, clarify and reduce the length of these chapters. Additionally, a new Chapter 7 is proposed detailing the process for accepting, reviewing and evaluating funding applications for the Wyoming Water Development Program.

Two versions of the proposed revisions are being provided 1) A clean version showing how the document will read if all of the proposed revisions are accepted, and 2) An underline/strikeout version showing language proposed to be added (underline) and language proposed to be removed (strikeout).

Please click on the link below to view the proposed changes.

 Proposed Rule Changes


You may either email us your comments, fill out the online comment form below, or mail comments to the Wyoming Water Development Office (6920 Yellowtail Dr., Cheyenne, WY 82002).

*Deadline for comments is 11:59pm, May 30, 2017.


   Citizen    Government    Business    Visitor   Privacy Policy