Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 27. PROJECT:Evansville Elkhorn Creek Water Supply
LEVEL:New Project
SPONSOR:Town of Evansville
LOCATION:Natrona County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date

PROJECT INFORMATION:
The population of Evansville is approximately 1,600 residents. There are 80 active commercial taps and 681 active residential taps served by the system.

In 1994 and 1995, the town requested a Level III loan and grant funding in the amount of approximately $900,000 for replacement of the Elkhorn Creek raw water transmission main, and construction of an infiltration gallery, disinfection and monitoring facility. The Elkhorn right is a territorial right (1884) with a firm yield of approximately 200 gpm (0.40 cfs). The right can supply the present average day, winter time demand of Evansville. The feasibility of undertaking this project was investigated as part of the Level II Natrona County Regional Water Plan study.

The Town of Evansville has decided not to participate in the Natrona Regional Water System. The cost of the piping to connect Evansville to the Natrona County Regional System is approximately $202,000 compared to this project cost of $900,000. Therefore, in 1994 and 1995, the WWDC recommended that the request for loan and grant funding for the Elkhorn Creek Water Supply Project be denied. However, during its January, 1996 meeting, the Legislative Select Water Committee voted to recommend funding the project as a phased 100% loan.

RECOMMENDED LEGISLATIVE ACTION:
The Legislative Select Water Committee recommends that the project be incorporated into the Rehabilitation Program at Level III status with an appropriation of $50,000. The recommended financing plan includes a 100% loan with an interest rate of 7.25% and a term of 20 years. This initial appropriation will be used to obtain EPA clearance for the project. If the clearance is obtained, an additional loan request of $650,000 will be expected to complete the project.

   Citizen    Government    Business    Visitor   Privacy Policy