Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 58. PROJECT:North Strawberry Canal
LEVEL:New Application
SPONSOR:North Strawberry Canal Company
LOCATION:Lincoln County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The North Strawberry Canal supplies irrigation water to 3200 acres of flood irrigation and sprinkler systems. The present diversion structure is located at the mouth of Strawberry Canyon. The system requires numerous pumps at selected points along the system to complete the transmission of the irrigation water to certain sections of the irrigated lands. The canal users would like to replace the canal with a pipeline thereby converting the system to a gravity pressure system to eliminate ditch losses and pumping costs, and reduce maintenance costs.

The proposed Level II study will serve to inventory the system, identify needed improvements, and consider rehabilitation alternatives. Conceptual designs and cost estimates will be prepared for the recommended alternative.

RECOMMENDED LEGISLATIVE ACTION:
The Commission recommends the project be incorporated into the Rehabilitation Program at Level II status with an appropriation of $50,000.