Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 79. PROJECT:Spring Draw Canal
LEVEL:New Application
SPONSOR:Spring Draw Ditch Company
LOCATION:Sheridan County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
The existing ditch and pipeline system serve 562 acres and 16 operators. Each irrigated acre is equivalent to one share in the district. Two users have 330 shares, the five largest users have 80% of the acreage. The present assessment is $10 per share per year. A prefeasibility study prepared at the company's expense estimated the total cost of rehabilitation at about $210,000 to replace the main ditch and laterals serving more than one user with pipelines. The ditch company has about 17,500 feet of ditch and pipeline in deteriorating condition. The company wants to replace the open ditch with a pressurized pipeline, which will eliminate pumping to pressurize sprinklers. The recommended appropriation will fund a study to refine the prefeasibility work, develop accurate cost estimates and financing plans for the replacement of various system components.

RECOMMENDED LEGISLATIVE ACTION:
The Commission recommends that the project be incorporated into the Rehabilitation Program at Level II status with a budget of $35,000.