Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 82. PROJECT:Thayne Water Supply
LEVEL:I
SPONSOR:Town of Thayne
LOCATION:Lincoln County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 8 1995 I $50,000 1996

PROJECT INFORMATION:
The Town supplies water to 150 taps. The water supply system consists of a spring collection system which is pumped into a storage tank. The tank is located on a hillside approximately one mile from the corporate limits. The system cannot meet the present water demands including the fire flow requirements. There are plans to construct a new secondary school in town. Further, Thayne would like to expand through annexation but cannot provide the water for the proposed expansion. The system may need additional supply, transmission, and storage facilities.

Level I study served to inventory the existing system, evaluated water supply needs, and evaluated water supply alternatives for the Town of Thayne and the Bedford Water and Sewer District. Preliminary plans and cost estimates were developed for the preferred alternative. The proposed Level II study will include a water supply plan for the Town of Thayne, the Bedford Water and Sewer District and Turnerville (the Willow Creek Pipeline Company).

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be advanced to Level II status with an appropriation of $250,000.