Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 85. PROJECT:Vista West Water Supply
LEVEL:III
SPONSOR:Vista West Improvement and Service District
LOCATION:Crook County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level III 28 1994 I $540,000* 1997
*67% grant, 33% loan (4%, 31 years, 1 year deferral)

PROJECT INFORMATION:
The Vista West Improvement and Service District serves 29 homes, a mobile home park and the Teen Challenge Facility. The district is supplied by a collection gallery in a spring located in Ogden Canyon, approximately 3 miles from the district. Water is pumped from the collection gallery approximately one mile to a 50,000 gallon buried storage tank located on a ridge. From this point, the water flows by gravity to a booster pump at the subdivision where the water is treated and delivered to a 70,000 gallon buried storage tank. The existing system is costly to operate, cannot meet fire flow requirements, and does not meet EPA standards for surface water treatment.

The Level II study first analyzed the feasibility of purchasing water from the Town of Sundance since that alternative would use an existing and verified source. Cost of this alternative was estimated to be $70 per tap per month for users in Vista West. Consequently, test holes were drilled in Reuter Canyon. One of the wells had an estimated yield in excess of 100 gpm. A second well yields about 12 gpm. The project includes the cost of converting the wells to production status, a pipeline from the wells to the town's existing storage tank, repairs to the tank, and removal and reclamation of the town's existing water supply facilities on the National Forest.

In 1994, the WWDC recommended that the project be progressed in the New Development Program at Level III status. Construction began in the fall of 1995 and should be completed in 1996.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is needed on this project.

   Citizen    Government    Business    Visitor   Privacy Policy