Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1996 LEGISLATIVE REPORT
Project Reports

 87. PROJECT:Washakie Rural Water Supply
LEVEL:I
SPONSOR:Washakie County
LOCATION:Washakie County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 10 1994 I $100,000 1996

PROJECT INFORMATION:
The Washakie County Commissioners applied for assistance in performing a study to evaluate the potential of providing water to rural areas in the Worland area. There has been substantial residential development in rural Washakie County, and because groundwater is generally poor in the area there is need for a centralized water system.

The project identified all the rural users that could potentially be served by rural water systems in Washakie County. Several sources of supply were considered, but the Worland municipal system was determined to be the only cost effective choice. A maximum of 333 taps were identified, which would require approximately 78 miles of pipeline to serve. A number of variations in service area configuration were considered in an effort to delineate the most cost effective means to serve the maximum number of taps. The least expensive scenario would require monthly water bills of $84/tap to construct and operate.

A public meeting was held in Worland to present the results of this study. Attendees were informed that the County Commissioners requested WWDC conduct this study to give them information on the feasibility and costs to develop rural water systems in their area. They were informed that if they desire to pursue this idea they should begin the process of organizing into district(s) and contact WWDC.

RECOMMENDED LEGISLATIVE ACTION:
The WWDC recommends that the project be placed on Level II-Hold status.

   Citizen    Government    Business    Visitor   Privacy Policy