PROJECT INFORMATION:
The project will serve 450 residents with 230 taps. The town is concerned
about rapid development within the corporate limits as well as the
surrounding areas. The town requested WWDC assistance to improve their
water supply system. Alpine has prepared the equivalent of a Level II
study with their own financial resources.
The town's study identified the need for two storage facilities and
pipelines. These new facilities would have the capacity to meet the
growing needs of the town as well as the adjoining subdivisions. In 1995,
the final design and permitting was completed and construction commenced.
The project was activated in the fall of 1996 and is in service. Some
minor cleanup and telemetry remains to be completed at this time. As
surrounding areas develop, the Town of Alpine is in a position to assist
with additional potable water demand.
RECOMMENDED LEGISLATIVE ACTION:
No legislative action is needed for this project.