Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1997 LEGISLATIVE REPORT
Active Projects

 35. PROJECT:Gillette Rehabilitation
LEVEL:New Application
SPONSOR:City of Gillette
LOCATION:Campbell County
PROGRAM:Rehabilitation

PROJECT INFORMATION:
In a related project, two Madison Well Field wells have been drilled and will be placed into operation in 1997. During the design of these two wells it was determined that the existing electrical distribution system for the Madison Well Field is inadequate. The condition will become more critical once the two new wells are placed on line. The project entails the installation of new electrical distribution cable, new transformers, a grounding system, new surge arresters, new switch gear, and new electrical controls. The installation of the needed equipment will improve operational efficiency. It will also improve safety of well field operations.

RECOMMENDED LEGISLATIVE ACTION:
It is recommended that the project be introduced as a Level III rehabilitation project. The recommended appropriation is $300,000 in grant funds for 50% of project costs. It is also recommended that the sponsor secure funding from other sources.

   Citizen    Government    Business    Visitor   Privacy Policy