Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 19. PROJECT:Cody Raw Water
LEVEL:III
SPONSOR:City of Cody
LOCATION:Park County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 8 1995 I $75,000   1996
Level III 59 1996 I $850,000* 1999
*50% grant

PROJECT INFORMATION:
The sponsor currently utilizes a raw water system for the main part of town that satisfies the irrigation needs of its residents, and the park and golf course irrigation demands for the city. The raw water system has been in existence for many years and is in need of updated pumping, conveyance, and storage facilities. The Shoshone Pipeline, which meets the potable water needs of the Northern Bighorn Basin, was designed assuming Cody's raw water system would continue to meet the raw water needs of the area, thereby reducing the design capacity of the Shoshone Pipeline.

The sponsor has acquired the services of Engineering Associates to prepare a Level II study and cost estimates for rehabilitation of their existing raw water system, and for expansion of that system into the rest of the city. The sponsor has decided to proceed with this effort in phases, starting with the rehabilitation portion of the project. The rehabilitation effort includes: new pumping equipment at New Cody Reservoir, an upgrade to the existing pumping equipment, additional pumping equipment at Beck Lake, a new 1 million gallon storage tank at a higher elevation, and 10,880 feet of new 8 - 18 inch transmission main. The total project budget is $1,700,000.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is necessary.