Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 46. PROJECT:Gunbarrel Lateral Rehabilitation
LEVEL:III
SPONSOR:Platte County Resource District
LOCATION:Platte County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 8 1995 II $100,000   1996
Level III 45 1997 II $250,000* 2000
*100% cost of project materials

PROJECT INFORMATION:
This project was recommended by a Level II study for the Wheatland Irrigation District Laramie River Diversion.

For the Gunbarrel Lateral Rehabilitation Project, the total project budget is $500,000. The Platte County Resource District, Platte County, Gunbarrel Lateral Ditch Co., the Natural Resource Conservation Service, and the Wheatland Irrigation District will provide installation labor, equipment and some construction materials. The design for the project has been completed and is currently under review. Construction is anticipated during the spring of 1998.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required on this project.