Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 65. PROJECT:Lusk Water Supply
LEVEL:III
SPONSOR:Town of Lusk
LOCATION:Niobrara County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 10 1994 I $75,000   1996
Level II 8 1995 I $150,000   1996
Level III 59 1996 I $420,000* 1999
*67% grant, 33% loan (4%, 20 years)

PROJECT INFORMATION:
The Town of Lusk's water supply system is supplied by five wells which are over 40 years old. Water is conveyed to the town through a pipeline with lead joints to their storage tanks. The town is having some difficulty meeting the EPA safe drinking water requirements.

Construction of the project is essentially complete. Final payment to the contractor is anticipated after January 1, 1998, and the project will be closed out shortly after that.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required for this project.