Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 74. PROJECT:Newcastle Water Supply (Salt Creek Water Supply)
LEVEL:II
SPONSOR:Town of Newcastle, Salt Creek and West End Water Districts
LOCATION:Weston County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level I 15 1996 I $100,000 1998
Level II 46 1997 I $500,000 1998

PROJECT INFORMATION:
Originally funded as a water supply study for the Salt Creek Water District, this project has evolved into a regional master plan study of the Newcastle area. The expanded study area will include a population of over 4,000 served by 1750 taps. In 1996, the Level I study identified other water supply problems in the Newcastle area. The Town of Newcastle needs additional water supply, and the West End water district operates without any storage facility, as does the Salt Creek district. WWDC has combined the needs of these three entities in a cooperative effort, and performed the current Level II feasibility study. This work will culminate in the construction of a new Madison well in the Salt Creek Water District, and the use of this and an existing Madison well in the West End district as backup supplies for the Town of Newcastle. In return, the town's excess storage capacity will be used to support the two districts.

The new Madison test well has been constructed, with its initial production falling short of project requirements. It is proposed herein that additional funding be authorized to perform an acid stimulation of the Madison formation in this well. This process has the potential to improve well yield to the point where it can meet the needs of the project.

Upon securing a suitable groundwater supply, further system modeling will be performed to determine the facilities necessary to tie the three systems together. The Cambria district will also be included in this Level II regional master plan study.

RECOMMENDED LEGISLATIVE ACTION:
It is recommended the Legislature authorize $140,000 to complete an acid stimulation process, and related engineering work, on the Madison well recently completed as part of this project.