Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1998 LEGISLATIVE REPORT
Project Reports

 80. PROJECT:Osage Water Supply
LEVEL:III
SPONSOR:Osage Water District
LOCATION:Weston
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 10 1994 I Hold   1996
Level II 8 1995 I $140,000   1996
Level III 45 1997 I $1,205,000* 2000
*51% grant, 10% loan (4%, 20 years)

PROJECT INFORMATION:
The Osage Water District has purchased a well and the water transmission, distribution, and storage system from Black Hills Power and Light. Funding from WWDC, RUS, and WFLB has been secured and the engineer has started design phase activities. Construction is anticipated to begin and be completed in 1998.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required for this project.

   Citizen    Government    Business    Visitor   Privacy Policy