Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1999 LEGISLATIVE REPORT
Active Projects

 20. PROJECT:Crestview/Antelope Valley Water Supply
LEVEL:II
SPONSOR:Crestview Water and Sewer District
LOCATION:Campbell County
PROGRAM:New Development
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 8 1995 II $200,000 2000

PROJECT INFORMATION:
The Crestview and Antelope Valley Water and Sewer Districts are adjacent to each other, and lie outside the area that has been determined to be serviceable from Gillette's system. The districts are experiencing growth and are nearing the capacity of their water supply systems. The project includes analyses of both Crestview and Antelope Valley to determine the level of need, and exploratory well construction. Antelope Valley has a tap installed for connection to Crestview's system. A combined project may provide the most efficient means to enhance the water supply for both districts.

Analyses of each district is complete and an exploratory well location has been selected. Permits are nearly in place, and well construction should begin by early 1999.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required.