Citizen    Government    Business    Visitor
Wyoming Water Development Commission 
Harry C. LaBonde, Jr., PE, Director 
6920 Yellowtail Rd, Cheyenne, WY 82002 
Phone: 307-777-7626 

Agency Information
green drop bullet Mission Statement
green drop bullet Directory
green drop bullet Calendar
green drop bullet Commission Agendas & Minutes
green drop bullet Consultant Selection
green drop bullet Items Open for Public Comment
green drop bullet Newsletter
green drop bullet Operating Criteria
green drop bullet Project Application Information
green drop bullet Send Us Your Comments

Planning Program
green drop bullet Dam and Reservoir Planning
green drop bullet Groundwater Grant Projects
green drop bullet Instream Flow Filings
green drop bullet Current Planning Projects
green drop bullet River Basin Planning
green drop bullet Weather Modification Study
green drop bullet Probable Maximum Precipitation
green drop bullet Water Research Projects

Construction Program
green drop bullet Current Construction Projects
green drop bullet Small Water Projects

Agency Publications
green drop bullet Project Reports
green drop bullet Water/Climate Web Atlas
green drop bullet Irrigation & Water System Surveys
green drop bullet Legislative Reports
green drop bullet Water Mgmnt & Conservation Dir
green drop bullet History of Wyoming Water Law

WWDC Home Page

Water Plan Home Page

WRDS Home Page

1999 LEGISLATIVE REPORT
Active Projects

 40. PROJECT:Greybull Rehabilitation
LEVEL:III
SPONSOR:Town of Greybull
LOCATION:Big Horn County
PROGRAM:Rehabilitation
  
EXISTING LEGISLATION:
Purpose Chapter Session Account Appropriation Due Date
Level II 8 1995 I $75,000   1996
Level III 59 1996 II $355,000* 1999
*50% grant, 50% loan (4%, 20 years)

PROJECT INFORMATION:
In 1995, the Level II study identified several needed improvements to the Shell Creek transmission pipeline. These improvements were incorporated into a Level III rehabilitation project for the town.

The pipeline improvements including new fittings, meter building and appurtenances have been constructed in 1998. The SCADA portion of the project should be completed in early 1999.

RECOMMENDED LEGISLATIVE ACTION:
No legislative action is required on this project.